Iň täze köpugurly elektronika çözüwleri bilen öýüňizi özgertmegiňiz mümkin — akylly yşyklandyryşdan başlap, ses arkaly dolandyrylýan enjamlara çenli; bularyň hemmesi durmuşy has aňsat, has howpsuz we has baglanyşykly etmek üçin döredilen. Amallaryňyzy Bently Nevada 3500 Gözegçilik ulgamy bilen optimizirlaň, ol näsazlyklaryň öňüni almak we işleme döwrüni iň ýokary derejede saklamak üçin hakyky wagt režiminde wibrasiýa we enjamyň ýagdaýyna gözegçilik edýär.
Haryt kody:IC755CSS06RDA
IC755CSS06RDA GE QuickPanel 6in TFT Display Ethernet RS232
Manufacturer: General Electric
Product No.: IC755CSS06RDA
Product Type: Operator Interface
Product Origin: USA
Payment:T/T, Western Union
Weight: 620g
Shipping port: Xiamen
Warranty: 12 months
Paýlaş
- Çalt eltip berme
- 24/7 goldaw
- Hil üpjünçiligi
Düşündiriş
GE IC755CSS06RDA QuickPanel+ 6-Inch HMI Terminal
The GE IC755CSS06RDA is a QuickPanel+ operator terminal featuring a 6-inch TFT LCD display with 800 x 480 resolution. Powered by a 1 GHz Freescale i.MX535 ARM Cortex A8 processor, it includes 512 MB DDR2 SDRAM and 256 MB SLC NAND Flash. Weighing 0.62 kg (1.38 lbs), it operates on 24 VDC with 15 W maximum power consumption.
Technical Specifications
| Parameter | Value |
|---|---|
| Manufacturer | GE Fanuc |
| Part Number | IC755CSS06RDA |
| Product Line | QuickPanel+ |
| Display Size | 6-inch TFT LCD |
| Resolution | 800 x 480 pixels (SVGA) |
| Colors | 65,536 |
| Brightness | 310 cd/m² |
| Touchscreen | Projective Capacitive, Two-Point |
| Processor | Freescale i.MX535 1 GHz ARM Cortex A8 |
| RAM | 512 MB DDR2 SDRAM |
| ROM | 256 MB SLC NAND Flash |
| SRAM | 512 KB (battery backed) |
| Operating System | Windows Compact Embedded 7 |
| Ethernet Ports | 1 x 10/100BaseT (RJ-45) |
| Serial Ports | 1 x RS-232 (5-pin) |
| USB Ports | 2 x USB 2.0 Type-A, 1 x USB 2.0 Mini Type-B |
| Storage Slot | 1 x SD/SDHC Card Slot |
| Supply Voltage | 24 VDC |
| Power Consumption | 15 W maximum |
| Dimensions (W x H x D) | 192 x 137 x 36 mm (7.5 x 5.3 x 1.4 in) |
| Weight | 0.62 kg (1.38 lbs) |
| Operating Temperature | 0°C to 55°C (32°F to 131°F) |
| Humidity | 85% max (non-condensing) |
| Mounting | Panel Mount / VESA 75 |
Communication Ports
| Port Type | Specification |
|---|---|
| Ethernet | 1 x 10/100BaseT (RJ-45), max 100m |
| RS-232 | 1 x 5-pin UART, max 15m |
| USB Host | 2 x USB 2.0 Type-A |
| USB Device | 1 x USB 2.0 Mini Type-B |
| Storage | 1 x SD/SDHC Card Slot |
Installation & Field Application Guide
- Mount the terminal using panel mount cutout or VESA 75 bracket. Ensure proper sealing for panel mount applications.
- Connect 24 VDC power supply. Power consumption is 15 W maximum; size power supply accordingly.
- Connect Ethernet cable for PLC communication (max 100m). Use shielded cable for industrial environments.
- For RS-232 communication, limit cable length to 15 meters. Use proper pinout for target PLC.
Why Choose the IC755CSS06RDA
- 6-inch TFT display with 800 x 480 resolution for clear operator visualization.
- 1 GHz ARM Cortex A8 processor with 512 MB RAM for responsive HMI performance.
- Windows Compact Embedded 7 with standard networking tools (FTP, SNTP).
- SD/SDHC card slot for application backup and data logging.
Field Engineer FAQs
Q1: What software is used to program the IC755CSS06RDA?
A1: QuickPanel+ terminals are programmed using Proficy Machine Edition, specifically the View Panel application.
Q2: Can the IC755CSS06RDA communicate with multiple PLCs simultaneously?
A2: Yes, it supports multiple protocol drivers. The Ethernet port can connect to multiple devices using supported protocols.
Q3: Is the battery for SRAM backup replaceable?
A3: Yes, the SRAM has a replaceable battery. Battery life is approximately 5 years under normal operating conditions.
Inquiries: sale@etowonauto.com
Goşmaça spesifikasiýalar
- Arassala
Skalyar (V/f)
Wektor
AC tok bilen işleýän
Satyn alyş gollanmasy
- Sargyt etmezden ozal takyk modeli, bölek belgisini we aýratynlyklary tassyklaň.
- Bar bolan enjamyňyz ýa-da dolandyryş ulgamlaryňyz bilen laýyklygyny üpjün ediň.
- Tehniki kömek üçin sale@etowonauto.com ýa-da +8617859788089 arkaly habarlaşyň.
- Eltip beriş mümkinçiliklerini, öňdebaryş möhletlerini we iberiş talaplaryny gözden geçiriň.
- Gurnama wagty öndürijiniň görkezmelerine hem-de iň oňat tejribelere eýeriň.
Eltip bermek we gaýtarmak
Stokda bar bolan harytlar adatça şol bir iş gününde ugradylýar. Häzir stokda bolmadyk önümler üçin iberiş wagty elýeterliligine görä üýtgäp biler. Halkara eltip bermek mümkindir we eltip bermek tölegleri barýan ýeriňe, agramyna we daşaýjynyň saýlanmagyna görä hasaplanýar.
Harytlar ulanylman we asyl ýagdaýynda bolmak şerti bilen, alnan gününden başlap 30 günüň içinde yzyna gaýtarmak kabul edilýär. Yzyna iberiş üçin eltip bermek çykdajylary müşderiniň jogapkärçiliginde. Yzyna gaýtarmak baradaky rugsaty almak üçin, haýsydyr bir harydy yzyna ugratmazdan öň biziň bilen habarlaşmagyňyzy haýyş edýäris.
Has giňişleýin maglumat üçin, biziň Iberiş we yzyna gaýtarmak syýasatymyzy.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Çalt eltip bermek
Asyl senagat awtomatizasiýa şaýlary gyssagly iberiliş üçin bütin dünýä boýunça elýeterlidir.
-
Aňsat gaýtaryşlar
Ygtybarly satuwdan soňky gorag üçin 30 günlük yzyna gaýtarmak goldawy we 12 aýlyk kepilnama.
-
24/7 goldaw
Durnukly we netijeli işleýşi saklamaga ýardam edýän çeýe, professional goldaw.
-
Hakyky we Asyl
100% hakyky, ygtybarly senagat awtomatizasiýasy öndürijilerinden gönüden-göni üpjün edilýär.
Tehniki we satyn alyş gollanmasy
-
How Does TSI Integration Reduce Turbine False Trip Risks?
This article examines data-driven turbine safety monitoring and mechanical fault diagnosis within industrial automati...
-
Can turn-key automation services really cut plant downtime by 47%?
This article examines how fragmented PLC, DCS, TSI, and power-protection systems drive hidden operational losses in p...
-
Is Your Manufacturing Execution Still Stuck in Open-Loop Mode?
This article examines how closed-loop automated control resolves the critical disconnect between production planning ...
-
Can Predictive Analytics Cut Factory Automation Downtime?
This article examines how predictive abnormality pre-judgment technology addresses the economic burden of reactive fa...
-
Is Full PLC Replacement Best for Brown-Field Automation?
This technical article analyzes the hidden costs of full-scale PLC and DCS hardware replacement in brown-field plants...
-
Is Your DCS Logic Tuning Ready for Real-World Production Loads?
This article examines the critical role of physical on-site commissioning and logic tuning in industrial automation, ...
