Iň täze köpugurly elektronika çözüwleri bilen öýüňizi özgertmegiňiz mümkin — akylly yşyklandyryşdan başlap, ses arkaly dolandyrylýan enjamlara çenli; bularyň hemmesi durmuşy has aňsat, has howpsuz we has baglanyşykly etmek üçin döredilen. Amallaryňyzy Bently Nevada 3500 Gözegçilik ulgamy bilen optimizirlaň, ol näsazlyklaryň öňüni almak we işleme döwrüni iň ýokary derejede saklamak üçin hakyky wagt režiminde wibrasiýa we enjamyň ýagdaýyna gözegçilik edýär.
Haryt kody:IC755ACCBATTNL
IC755ACCBATTNL | Quickpanel Backup Battery 512KB SRAM GE
Manufacturer: General Electric
Product No.: IC755ACCBATTNL
Product Type: Battery Module
Product Origin: USA
Payment:T/T, Western Union
Weight: 1360g
Shipping port: Xiamen
Warranty: 12 months
Paýlaş
- Çalt eltip berme
- 24/7 goldaw
- Hil üpjünçiligi
Düşündiriş
Product Overview
The GE Fanuc IC755ACCBATTNL replacement battery pack provides backup power for 10-inch, 12-inch, and 15-inch Quickpanel+ industrial operator terminals. This lithium coin cell maintains the 512KB battery-backed SRAM, preserving critical configuration data during power interruptions. Use only this pack for battery replacement on these Quickpanel+ units.
Core Functionality
The IC755ACCBATTNL supplies continuous power to the SRAM when the terminal is disconnected from main power. This ensures retention of application programs, screen configurations, and historical data. The lithium coin cell offers long shelf life and stable voltage output. Replacement is required when the battery degrades from repeated charge/discharge cycles and can no longer sustain data retention for the appropriate duration.
Technical Specifications
| Parameter | Value |
| Part Number | IC755ACCBATTNL |
| Manufacturer | GE Fanuc / Emerson |
| Product Type | Replacement Battery Pack |
| Compatibility | 10", 12", 15" Quickpanel+ terminals |
| Battery Type | Lithium Coin Cell |
| Material | Lithium |
| Backed Memory | 512 KB SRAM |
| Weight | 1.36 kg (3.00 lbs) |
| Location | Back of Quickpanel terminal |
| Hazardous Installation | Not recommended |
Installation Guide
Perform replacement only in a non-hazardous location with trained personnel. Remove the 7 screws securing the back cover. Gently press on either side of the tab to release the cover, then lift it upward. Locate the coin cell battery and note its polarity. Remove the old battery and install the new one with correct orientation. Replace the back cover and tighten screws to secure. Dispose of faulty batteries per local and state regulations.
Safety Instructions
Lithium coin batteries present fire and explosion risks if mishandled. Do not crush, disassemble, short-circuit, or incinerate the battery. Store in a cool, dry location away from conductive materials. Replace only with the IC755ACCBATTNL pack – using alternative batteries may cause damage or data loss. Faulty batteries must be recycled through approved collection programs.
Engineering Advantages
This genuine GE Fanuc battery pack ensures reliable data retention for Quickpanel+ SRAM memory. The lithium coin cell delivers stable voltage over extended periods, minimizing the risk of configuration loss. The pack is specifically validated for 10, 12, and 15-inch terminals, eliminating compatibility concerns. The straightforward coin-cell design simplifies field replacement with basic tools and minimal downtime.
Technical FAQs
Q1: How do I know when the battery needs replacement?
A1: The Quickpanel+ displays a low-battery warning message. Data loss or configuration corruption upon power cycling also indicates the battery requires replacement.
Q2: Can I use a third-party battery instead of IC755ACCBATTNL?
A2: No. GE Fanuc specifies that only the IC755ACCBATTNL pack should be used. Third-party batteries may have incorrect voltage, polarity, or form factor causing damage.
Q3: Is the battery replacement hot-swappable?
A3: No. The terminal must be powered off and disconnected from main power before opening the back cover and replacing the battery.
Goşmaça spesifikasiýalar
- Arassala
Skalyar (V/f)
Wektor
AC tok bilen işleýän
Satyn alyş gollanmasy
- Sargyt etmezden ozal takyk modeli, bölek belgisini we aýratynlyklary tassyklaň.
- Bar bolan enjamyňyz ýa-da dolandyryş ulgamlaryňyz bilen laýyklygyny üpjün ediň.
- Tehniki kömek üçin sale@etowonauto.com ýa-da +8617859788089 arkaly habarlaşyň.
- Eltip beriş mümkinçiliklerini, öňdebaryş möhletlerini we iberiş talaplaryny gözden geçiriň.
- Gurnama wagty öndürijiniň görkezmelerine hem-de iň oňat tejribelere eýeriň.
Eltip bermek we gaýtarmak
Stokda bar bolan harytlar adatça şol bir iş gününde ugradylýar. Häzir stokda bolmadyk önümler üçin iberiş wagty elýeterliligine görä üýtgäp biler. Halkara eltip bermek mümkindir we eltip bermek tölegleri barýan ýeriňe, agramyna we daşaýjynyň saýlanmagyna görä hasaplanýar.
Harytlar ulanylman we asyl ýagdaýynda bolmak şerti bilen, alnan gününden başlap 30 günüň içinde yzyna gaýtarmak kabul edilýär. Yzyna iberiş üçin eltip bermek çykdajylary müşderiniň jogapkärçiliginde. Yzyna gaýtarmak baradaky rugsaty almak üçin, haýsydyr bir harydy yzyna ugratmazdan öň biziň bilen habarlaşmagyňyzy haýyş edýäris.
Has giňişleýin maglumat üçin, biziň Iberiş we yzyna gaýtarmak syýasatymyzy.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Çalt eltip bermek
Asyl senagat awtomatizasiýa şaýlary gyssagly iberiliş üçin bütin dünýä boýunça elýeterlidir.
-
Aňsat gaýtaryşlar
Ygtybarly satuwdan soňky gorag üçin 30 günlük yzyna gaýtarmak goldawy we 12 aýlyk kepilnama.
-
24/7 goldaw
Durnukly we netijeli işleýşi saklamaga ýardam edýän çeýe, professional goldaw.
-
Hakyky we Asyl
100% hakyky, ygtybarly senagat awtomatizasiýasy öndürijilerinden gönüden-göni üpjün edilýär.
Tehniki we satyn alyş gollanmasy
-
Can Standardized Engineering Cut Factory Upgrade Costs by 40%?
This article presents a data‑driven alternative to full control system replacements in brown‑field plants. Allen‑Brad...
-
Choosing the Right Gas Detector for Chemical Safety?
This article examines the operational and financial impact of unreliable gas-sensing hardware in chemical process pla...
-
Is Mixed-Plant Data Fragmentation Costing You More?
Hybrid manufacturing facilities often lose nearly one-third of production data across disjointed PLC and DCS systems,...
-
Can Transient Monitoring Prevent Rotating Machinery Failures?
This technical article examines the critical role of transient data capture in rotating machinery protection, highlig...
-
Can Smart Gas Monitoring Cut False Alarms in Oil Facilities?
This article examines gas detection challenges in extreme oil and gas environments where legacy sensors show high dri...
-
Fixed Gas Detector or Transmitter – Which Protects Your Plant Better?
This technical article examines the critical operational differences between fixed gas detectors and gas detection tr...
