Iň täze köpugurly elektronika çözüwleri bilen öýüňizi özgertmegiňiz mümkin — akylly yşyklandyryşdan başlap, ses arkaly dolandyrylýan enjamlara çenli; bularyň hemmesi durmuşy has aňsat, has howpsuz we has baglanyşykly etmek üçin döredilen. Amallaryňyzy Bently Nevada 3500 Gözegçilik ulgamy bilen optimizirlaň, ol näsazlyklaryň öňüni almak we işleme döwrüni iň ýokary derejede saklamak üçin hakyky wagt režiminde wibrasiýa we enjamyň ýagdaýyna gözegçilik edýär.
Haryt kody:IC755ACCBATTNL
IC755ACCBATTNL | Quickpanel Backup Battery 512KB SRAM GE
Manufacturer: General Electric
Product No.: IC755ACCBATTNL
Product Type: Battery Module
Product Origin: USA
Payment:T/T, Western Union
Weight: 1360g
Shipping port: Xiamen
Warranty: 12 months
Paýlaş
- Çalt eltip berme
- 24/7 goldaw
- Hil üpjünçiligi
Düşündiriş
Product Overview
The GE Fanuc IC755ACCBATTNL replacement battery pack provides backup power for 10-inch, 12-inch, and 15-inch Quickpanel+ industrial operator terminals. This lithium coin cell maintains the 512KB battery-backed SRAM, preserving critical configuration data during power interruptions. Use only this pack for battery replacement on these Quickpanel+ units.
Core Functionality
The IC755ACCBATTNL supplies continuous power to the SRAM when the terminal is disconnected from main power. This ensures retention of application programs, screen configurations, and historical data. The lithium coin cell offers long shelf life and stable voltage output. Replacement is required when the battery degrades from repeated charge/discharge cycles and can no longer sustain data retention for the appropriate duration.
Technical Specifications
| Parameter | Value |
| Part Number | IC755ACCBATTNL |
| Manufacturer | GE Fanuc / Emerson |
| Product Type | Replacement Battery Pack |
| Compatibility | 10", 12", 15" Quickpanel+ terminals |
| Battery Type | Lithium Coin Cell |
| Material | Lithium |
| Backed Memory | 512 KB SRAM |
| Weight | 1.36 kg (3.00 lbs) |
| Location | Back of Quickpanel terminal |
| Hazardous Installation | Not recommended |
Installation Guide
Perform replacement only in a non-hazardous location with trained personnel. Remove the 7 screws securing the back cover. Gently press on either side of the tab to release the cover, then lift it upward. Locate the coin cell battery and note its polarity. Remove the old battery and install the new one with correct orientation. Replace the back cover and tighten screws to secure. Dispose of faulty batteries per local and state regulations.
Safety Instructions
Lithium coin batteries present fire and explosion risks if mishandled. Do not crush, disassemble, short-circuit, or incinerate the battery. Store in a cool, dry location away from conductive materials. Replace only with the IC755ACCBATTNL pack – using alternative batteries may cause damage or data loss. Faulty batteries must be recycled through approved collection programs.
Engineering Advantages
This genuine GE Fanuc battery pack ensures reliable data retention for Quickpanel+ SRAM memory. The lithium coin cell delivers stable voltage over extended periods, minimizing the risk of configuration loss. The pack is specifically validated for 10, 12, and 15-inch terminals, eliminating compatibility concerns. The straightforward coin-cell design simplifies field replacement with basic tools and minimal downtime.
Technical FAQs
Q1: How do I know when the battery needs replacement?
A1: The Quickpanel+ displays a low-battery warning message. Data loss or configuration corruption upon power cycling also indicates the battery requires replacement.
Q2: Can I use a third-party battery instead of IC755ACCBATTNL?
A2: No. GE Fanuc specifies that only the IC755ACCBATTNL pack should be used. Third-party batteries may have incorrect voltage, polarity, or form factor causing damage.
Q3: Is the battery replacement hot-swappable?
A3: No. The terminal must be powered off and disconnected from main power before opening the back cover and replacing the battery.
Goşmaça spesifikasiýalar
- Arassala
Skalyar (V/f)
Wektor
AC tok bilen işleýän
Satyn alyş gollanmasy
- Sargyt etmezden ozal takyk modeli, bölek belgisini we aýratynlyklary tassyklaň.
- Bar bolan enjamyňyz ýa-da dolandyryş ulgamlaryňyz bilen laýyklygyny üpjün ediň.
- Tehniki kömek üçin sale@etowonauto.com ýa-da +8617859788089 arkaly habarlaşyň.
- Eltip beriş mümkinçiliklerini, öňdebaryş möhletlerini we iberiş talaplaryny gözden geçiriň.
- Gurnama wagty öndürijiniň görkezmelerine hem-de iň oňat tejribelere eýeriň.
Eltip bermek we gaýtarmak
Stokda bar bolan harytlar adatça şol bir iş gününde ugradylýar. Häzir stokda bolmadyk önümler üçin iberiş wagty elýeterliligine görä üýtgäp biler. Halkara eltip bermek mümkindir we eltip bermek tölegleri barýan ýeriňe, agramyna we daşaýjynyň saýlanmagyna görä hasaplanýar.
Harytlar ulanylman we asyl ýagdaýynda bolmak şerti bilen, alnan gününden başlap 30 günüň içinde yzyna gaýtarmak kabul edilýär. Yzyna iberiş üçin eltip bermek çykdajylary müşderiniň jogapkärçiliginde. Yzyna gaýtarmak baradaky rugsaty almak üçin, haýsydyr bir harydy yzyna ugratmazdan öň biziň bilen habarlaşmagyňyzy haýyş edýäris.
Has giňişleýin maglumat üçin, biziň Iberiş we yzyna gaýtarmak syýasatymyzy.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Çalt eltip bermek
Asyl senagat awtomatizasiýa şaýlary gyssagly iberiliş üçin bütin dünýä boýunça elýeterlidir.
-
Aňsat gaýtaryşlar
Ygtybarly satuwdan soňky gorag üçin 30 günlük yzyna gaýtarmak goldawy we 12 aýlyk kepilnama.
-
24/7 goldaw
Durnukly we netijeli işleýşi saklamaga ýardam edýän çeýe, professional goldaw.
-
Hakyky we Asyl
100% hakyky, ygtybarly senagat awtomatizasiýasy öndürijilerinden gönüden-göni üpjün edilýär.
Tehniki we satyn alyş gollanmasy
-
Why Hybrid AB PLC + ABB DCS Beat Single-Vendor Systems?
This article examines how hybrid integration of Allen‑Bradley PLC and ABB DCS overcomes single-vendor limitations in ...
-
PLC, DCS, or TSI: Which Controls Fit Your Plant?
This article reviews five trusted industrial control system combinations from Allen‑Bradley, ABB, Emerson, GE Fanuc, ...
-
How to Integrate GE Fanuc PLC with ABB DCS Using OPC UA?
This article delivers a practical guide for integrating GE Fanuc PLCs with ABB DCS using OPC UA in Industry 4.0 envir...
-
Can DCS-PLC Integration Cut Chemical Plant Downtime by 37%?
This technical article examines how strategic integration of Emerson DeltaV DCS and Allen-Bradley PLC resolves instab...
-
How to Source Genuine PLC/DCS Spares and Avoid Counterfeit Risks?
Global manufacturers face rising counterfeit PLC and DCS modules that cause signal deviations, unplanned failures, an...
-
Can Bently Nevada-PLC-DCS Integration End Unplanned Downtime?
This article examines how integrating Bently Nevada TSI sensors with PLC and DCS systems resolves industrial data fra...
