Iň täze köpugurly elektronika çözüwleri bilen öýüňizi özgertmegiňiz mümkin — akylly yşyklandyryşdan başlap, ses arkaly dolandyrylýan enjamlara çenli; bularyň hemmesi durmuşy has aňsat, has howpsuz we has baglanyşykly etmek üçin döredilen. Amallaryňyzy Bently Nevada 3500 Gözegçilik ulgamy bilen optimizirlaň, ol näsazlyklaryň öňüni almak we işleme döwrüni iň ýokary derejede saklamak üçin hakyky wagt režiminde wibrasiýa we enjamyň ýagdaýyna gözegçilik edýär.
Haryt kody:22D-D4P0N104
Allen-Bradley PowerFlex 40P 22D-D4P0N104 480V 3 Phase VFD
Manufacturer: Allen-Bradley
Product No.: 22D-D4P0N104
Product Type: AC Drive
Product Origin: USA
Payment:T/T, Western Union
Weight: 2300g
Shipping port: Xiamen
Warranty: 12 months
Paýlaş
- Çalt eltip berme
- 24/7 goldaw
- Hil üpjünçiligi
Düşündiriş
Allen-Bradley 22D-D4P0N104 PowerFlex 40P VFD
Product Overview
Allen-Bradley 22D-D4P0N104 is a PowerFlex 40P adjustable frequency AC drive. It delivers 2HP (1.5kW) output power at 4.0A. Operates on 342 528V AC 3 phase input. Features sensorless vector and V/Hz control. Panel mount IP20 enclosure with RS485 communication. Designed for conveyors, packaging, HVAC, pumps, and textile machinery.
Catalog Number Decoder
| Position | Code | Meaning |
|---|---|---|
| 1 3 | 22D | PowerFlex 40P |
| 4 | D | 480V AC 3 Phase |
| 5 | 4P0 | 4.0A Output (1.5kW / 2HP) |
| 6 | N | Panel Mount IP20 |
| 7 | 1 | Display/Fault Reset HIM |
| 8 | 0 | No EMC Filter |
| 9 | 4 | Standard Version |
Technical Specifications
| Parameter | Value |
|---|---|
| Brand | Allen-Bradley / Rockwell Automation |
| Model | 22D-D4P0N104 |
| Series | PowerFlex 40P |
| Output Power | 2 HP (1.5 kW) |
| Output Current | 4.0 A |
| Input Voltage Range | 342 528V AC 3 Phase |
| Input Current | 5.7 A |
| Frequency Range | 0 500 Hz |
| Control Type | Sensorless Vector / V/Hz |
| Carrier Frequency | 2 16 kHz adjustable |
| I/O | 7 DI, 2 DO, 1 AI, 1 AO |
| Communication | RS485 (DSI) |
| Enclosure | Panel Mount IP20 (NEMA Type Open) |
| Safe Torque Off | Category 3 (Series B) |
| Operating Temperature | 0°C to +50°C |
| Storage Temperature | 40°C to +85°C |
| Humidity | 0% to 95% non condensing |
| Weight | 2.3 kg (5.1 lbs) |
Installation
Mount upright on flat vertical surface. Use M4 (#8-32) screws for Frame B. Torque to 1.56 1.96 Nm. Provide minimum clearance for airflow. Use copper wire only. Power terminal accepts 5.3 mm² (10 AWG) max. I/O terminals accept 1.3 mm² (16 AWG) max. Wire gauge based on 75°C rating. Shielded cable recommended for motor leads over 15m. Remove MOV jumper for ungrounded distribution systems.
Wiring
Connect 3 phase input to R/L1, S/L2, T/L3. Connect motor to U/T1, V/T2, W/T3. Switch any two motor leads to change direction. Connect safety ground to PE terminal. Use shielded cable for analog and encoder signals. Separate control wires from power wires by 0.3m minimum. RS485 shield connects to I/O Terminal 19 and ground.
Features
Sensorless vector control for low speed torque. Process PID control. StepLogic positioning. 4 digit LCD display with 10 status LEDs. Wireless keypad option. Supports 31 drives per RS485 network. Optional EtherNet/IP and DeviceNet. DriveGuard Safe Torque Off Category 3. Motor overload protection and ground fault detection. Removable MOV for ungrounded systems.
FAQ
Q1: What is the maximum motor cable length?
A1: For 480V ratings with 1600V motor insulation, max cable length is 170m. For 1000V insulation, limit to 15m. Use output devices for longer runs.
Q2: How to remove MOV jumper for ungrounded systems?
A2: Loosen screw, pull jumper completely out of drive chassis, tighten screw. Required when line to ground voltage exceeds 125% of nominal line to line voltage.
Q3: What are the DIP switch settings?
A3: Analog Output Select sets 0 10V or 0 20mA. Sink/Source sets input wiring. Encoder Output sets 5V or 12V encoder power. Voltage Range Select sets unipolar or bipolar analog input.
Download
Goşmaça spesifikasiýalar
Skalyar (V/f)
Wektor
AC tok bilen işleýän
Satyn alyş gollanmasy
- Sargyt etmezden ozal takyk modeli, bölek belgisini we aýratynlyklary tassyklaň.
- Bar bolan enjamyňyz ýa-da dolandyryş ulgamlaryňyz bilen laýyklygyny üpjün ediň.
- Tehniki kömek üçin sale@etowonauto.com ýa-da +8617859788089 arkaly habarlaşyň.
- Eltip beriş mümkinçiliklerini, öňdebaryş möhletlerini we iberiş talaplaryny gözden geçiriň.
- Gurnama wagty öndürijiniň görkezmelerine hem-de iň oňat tejribelere eýeriň.
Eltip bermek we gaýtarmak
Stokda bar bolan harytlar adatça şol bir iş gününde ugradylýar. Häzir stokda bolmadyk önümler üçin iberiş wagty elýeterliligine görä üýtgäp biler. Halkara eltip bermek mümkindir we eltip bermek tölegleri barýan ýeriňe, agramyna we daşaýjynyň saýlanmagyna görä hasaplanýar.
Harytlar ulanylman we asyl ýagdaýynda bolmak şerti bilen, alnan gününden başlap 30 günüň içinde yzyna gaýtarmak kabul edilýär. Yzyna iberiş üçin eltip bermek çykdajylary müşderiniň jogapkärçiliginde. Yzyna gaýtarmak baradaky rugsaty almak üçin, haýsydyr bir harydy yzyna ugratmazdan öň biziň bilen habarlaşmagyňyzy haýyş edýäris.
Has giňişleýin maglumat üçin, biziň Iberiş we yzyna gaýtarmak syýasatymyzy.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Çalt eltip bermek
Asyl senagat awtomatizasiýa şaýlary gyssagly iberiliş üçin bütin dünýä boýunça elýeterlidir.
-
Aňsat gaýtaryşlar
Ygtybarly satuwdan soňky gorag üçin 30 günlük yzyna gaýtarmak goldawy we 12 aýlyk kepilnama.
-
24/7 goldaw
Durnukly we netijeli işleýşi saklamaga ýardam edýän çeýe, professional goldaw.
-
Hakyky we Asyl
100% hakyky, ygtybarly senagat awtomatizasiýasy öndürijilerinden gönüden-göni üpjün edilýär.
Tehniki we satyn alyş gollanmasy
-
Can a Bently Nevada TSI Retrofit Cut False Alarms 71.8%?
This technical guide examines the strategic approach to partial TSI system retrofits for Bently Nevada 3500 series ha...
-
Can Long-Term Vibration Trends Predict Rotating Equipment Fatigue?
Standard PLC and DCS systems often fail to detect progressive mechanical fatigue because they prioritize process vari...
-
How Do PLCs Turn Machine Data Into Proactive Risk Defense?
This article explores how Allen‑Bradley real‑time production monitoring mitigates hidden operational risks in disc...
-
Can Proper HMI Commissioning Really Cut Downtime by 54%?
This article examines the pivotal role of HMI visualization in industrial automation, drawing on field experience wit...
-
Can a Phased Retrofit Cut Your GE Upgrade Costs by Over 50%?
This article examines strategic approaches to modernizing legacy GE PLC and DCS systems in brown‑field industrial sit...
-
How does off-site monitoring cut fault diagnosis time by 79%?
This article examines how GE long-distance data transmission enables off-site centralized monitoring for geographi...
