Transform your home with the latest multi-electronics solutions, from intelligent lighting to vOptimize your operations with the Bently Nevada 3500 Monitoring System, offering real-time vibration and machinery condition monitoring to prevent failures and maximize uptime.oice-controlled devices all designed to make life easier, safer, and more connected.
SKU:ANB10D-425/CU2N
Yokogawa ANB10D-425/CU2N 19-inch Rack Unit
Manufacturer: Yokogawa
Product No.: ANB10D-425/CU2N
Product Type: Field Control Unit
Product Origin: SG
Payment:T/T, Western Union
Weight: 10000g
Shipping port: Xiamen
Warranty: 12 months
Share
- Fast Delivery
- 24/7 Support
- Quality Assurance
Description
Yokogawa ANB10D-425/CU2N ESB Bus Node Unit
The Yokogawa ANB10D-425/CU2N is a dual-redundant node unit for ESB bus systems. This 19-inch rack-mountable unit provides reliable connectivity and control for industrial automation.
Technical Specifications
- Brand & Model: Yokogawa ANB10D-425/CU2N
- Product Type: ESB Bus Node Unit
- Power Supply: 220-240V AC dual-redundant
- Power Consumption: 230 VA (120W)
- Weight: Approximately 10 kg (including 8 I/O modules)
Power Options
- 220-240V AC: 50/60 Hz, 230 VA (120W)
- 100-120V AC: 50/60 Hz, 200 VA (120W)
- 24V DC: 5.5 A current consumption
- Configuration: Dual-redundant power supply design
Installation & Mounting
- Mounting: Standard 19-inch rack installation
- Hardware: Uses M5 x 4 screws for secure mounting
- Accessory: Includes insulation bush for protection
- Capacity: Supports up to 8 I/O modules
System Features
- Bus Type: Dual-redundant ESB Bus Node Unit
- Option Code: /CU2N connector unit included
- Protection: Basic type with no explosion protection
- Reliability: Redundant design for continuous operation
Connection & Integration
- Connector unit for ESB bus integration
- Designed for industrial control system networks
- Compatible with Yokogawa automation systems
- Provides reliable node connectivity
Frequently Asked Questions
- What is the unit weight? Approximately 10 kg with 8 I/O modules.
- What power input does it use? 220-240V AC dual-redundant supply.
- How is it mounted? Standard 19-inch rack mounting.
Additional Specifications
Scalar (V/f)
Vector
AC-powered
Buying Guide
- Confirm the exact model, part number, and specifications before ordering.
- Ensure compatibility with your current machinery or control systems.
- Reach out via sale@etowonauto.com or +8617859788089 for technical assistance.
- Review delivery options, lead times, and shipping requirements.
- Follow manufacturer instructions and best practices during installation.
Shipping And Return
In-stock items are typically dispatched the same business day. For products not currently in stock, dispatch times may vary based on availability. International shipping is available, and shipping costs are calculated according to destination, weight, and carrier selection.
Returns are accepted within 30 days of receipt, provided items are unused and in original condition. Return shipping costs are the responsibility of the customer. Please contact us before returning any item to receive return authorization.
For more details, please review our Shipping & Return Policy.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Fast Shipping
Original industrial automation parts available for prompt shipment worldwide.
-
Easy Returns
30-day return support with a 12-month warranty for reliable after-sales protection.
-
24/7 support
Responsive professional support to help maintain stable and efficient operations.
-
Genuine & Original
100% authentic, sourced directly from trusted industrial automation manufacturers.
Technical & Buying Guide
-
Can a Multi-Vendor PM Checklist Cut PLC Downtime?
This article presents a standardized annual preventive maintenance checklist for mixed-vendor industrial control envi...
-
Why Emerson Hot Redundancy Retrofit Slashes Downtime by 96%?
Process plants relying on GE Fanuc single PLCs face 47% of unplanned outages from controller failure, costing $38,000...
-
Cut Migration Engineering Hours by 60% – How Does It Work?
This technical guide examines the operational risks and engineering overhead of maintaining separate GE Proficy HMI a...
-
Is Your 1756 Supply Chain Risking Production?
Counterfeit 1756 modules cause 68% of unplanned PLC downtime. This guide covers a four-step verification method, real...
-
Why Do 72% of Analog Loop Failures Trace Back to Wiring Errors?
This technical guide presents field-verified wiring protocols for integrating Emerson Rosemount 4–20mA HART transmitt...
-
GE Fanuc VersaMax: Did It Replace Obsolete ABB AC500-ECO?
This technical case study details a complete control system retrofit for a 1200m³/day municipal water plant. Our team...
