Transform your home with the latest multi-electronics solutions, from intelligent lighting to vOptimize your operations with the Bently Nevada 3500 Monitoring System, offering real-time vibration and machinery condition monitoring to prevent failures and maximize uptime.oice-controlled devices all designed to make life easier, safer, and more connected.
SKU:ANB10D-425/CU2N
Yokogawa ANB10D-425/CU2N 19-inch Rack Unit
Manufacturer: Yokogawa
Product No.: ANB10D-425/CU2N
Product Type: Field Control Unit
Product Origin: SG
Payment:T/T, Western Union
Weight: 10000g
Shipping port: Xiamen
Warranty: 12 months
Share
- Fast Delivery
- 24/7 Support
- Quality Assurance
Description
Yokogawa ANB10D-425/CU2N ESB Bus Node Unit
The Yokogawa ANB10D-425/CU2N is a dual-redundant node unit for ESB bus systems. This 19-inch rack-mountable unit provides reliable connectivity and control for industrial automation.
Technical Specifications
- Brand & Model: Yokogawa ANB10D-425/CU2N
- Product Type: ESB Bus Node Unit
- Power Supply: 220-240V AC dual-redundant
- Power Consumption: 230 VA (120W)
- Weight: Approximately 10 kg (including 8 I/O modules)
Power Options
- 220-240V AC: 50/60 Hz, 230 VA (120W)
- 100-120V AC: 50/60 Hz, 200 VA (120W)
- 24V DC: 5.5 A current consumption
- Configuration: Dual-redundant power supply design
Installation & Mounting
- Mounting: Standard 19-inch rack installation
- Hardware: Uses M5 x 4 screws for secure mounting
- Accessory: Includes insulation bush for protection
- Capacity: Supports up to 8 I/O modules
System Features
- Bus Type: Dual-redundant ESB Bus Node Unit
- Option Code: /CU2N connector unit included
- Protection: Basic type with no explosion protection
- Reliability: Redundant design for continuous operation
Connection & Integration
- Connector unit for ESB bus integration
- Designed for industrial control system networks
- Compatible with Yokogawa automation systems
- Provides reliable node connectivity
Frequently Asked Questions
- What is the unit weight? Approximately 10 kg with 8 I/O modules.
- What power input does it use? 220-240V AC dual-redundant supply.
- How is it mounted? Standard 19-inch rack mounting.
Additional Specifications
Scalar (V/f)
Vector
AC-powered
Buying Guide
- Confirm the exact model, part number, and specifications before ordering.
- Ensure compatibility with your current machinery or control systems.
- Reach out via sale@etowonauto.com or +8617859788089 for technical assistance.
- Review delivery options, lead times, and shipping requirements.
- Follow manufacturer instructions and best practices during installation.
Shipping And Return
In-stock items are typically dispatched the same business day. For products not currently in stock, dispatch times may vary based on availability. International shipping is available, and shipping costs are calculated according to destination, weight, and carrier selection.
Returns are accepted within 30 days of receipt, provided items are unused and in original condition. Return shipping costs are the responsibility of the customer. Please contact us before returning any item to receive return authorization.
For more details, please review our Shipping & Return Policy.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Fast Shipping
Original industrial automation parts available for prompt shipment worldwide.
-
Easy Returns
30-day return support with a 12-month warranty for reliable after-sales protection.
-
24/7 support
Responsive professional support to help maintain stable and efficient operations.
-
Genuine & Original
100% authentic, sourced directly from trusted industrial automation manufacturers.
Technical & Buying Guide
-
Can Emerson DeltaV DCS Cards Optimize Chemical Safety Loops?
This technical article examines how Emerson DeltaV DCS card upgrades address legacy control limitations in chemical p...
-
Is Partial CNC Board Replacement Better Than a Full System Upgrade?
This technical article examines the dominance of GE Fanuc CNC hardware in heavy-duty automation, supported by field d...
-
Can Genuine PLC Modules Cut DCS Downtime 60%?
This article examines how genuine Allen-Bradley PLC module replacement strategies directly reduce unplanned DCS downt...
-
Is Your GE Fanuc PLC Talking to ABB DCS?
This article reveals how cross-system data silos between GE Fanuc PLC and ABB DCS cause 8–15% production losses in pr...
-
Can Integrated PLC-DCS-TSI Fix Data Silos?
Most industrial digital twins remain static visualization tools because discrete control, process automation, and con...
-
How to Cut Power Plant Outages with ABB and GE Fanuc Retrofits?
This technical article outlines a data-driven approach to modernizing power plant control systems using a hybrid ABB ...
