Transform your home with the latest multi-electronics solutions, from intelligent lighting to vOptimize your operations with the Bently Nevada 3500 Monitoring System, offering real-time vibration and machinery condition monitoring to prevent failures and maximize uptime.oice-controlled devices all designed to make life easier, safer, and more connected.
SKU:IC697BEM734
IC697BEM734 GE 90-70 PLC Peer-to-Peer Datagram Module
Manufacturer: General Electric
Product No.: IC697BEM734
Product Type: Controller Board
Product Origin: USA
Payment:T/T, Western Union
Weight: 1810g
Shipping port: Xiamen
Warranty: 12 months
Share
- Fast Delivery
- 24/7 Support
- Quality Assurance
Description
Product Overview
The IC697BEM734 is a rugged, industrial Genius Bus Controller (GBC) manufactured by GE Fanuc for the Series 90-70 programmable logic controller (PLC) platform. Serving as an intelligent communication gateway, this single-slot module manages decentralized distributed networks utilizing Genius IC660 and IC661 input/output blocks. Weighing 1.81 kg, it offloads complex field communications from the central processing unit, facilitating deterministic peer-to-peer messaging, broad data acquisition, and real-time plant diagnostics across heavy-duty industrial automation applications.
Core Technical Advantages
-
Detailed Suffix Logic Breakdown:
- IC697: Establishes direct hardware form-factor alignment with the high-capacity GE Fanuc Series 90-70 VME rack.
- BEM: Identifies the module as a Bus Expansion Module purpose-built for field network coordination.
- 734: Represents the specific operational core and firmware iteration within the Genius interface line.
- Versatile Block Interfacing: Engineered specifically to act as a master communications link for legacy Genius IC660 and IC661 smart I/O blocks, safeguarding investments in existing field infrastructure.
- Flexible Baud Adjustments: Operates at a default transmission speed of 153.6 kbps, allowing tailored fieldbus configurations via system software to balance overall data throughput against physical network line distances.
- Advanced Datagram Messaging: Employs structured communication methodologies including Global data broadcasting, Directed control sequences, and Peer-to-Peer datagram configurations for efficient networking.
Technical Specifications
| Parameter | Specification Details |
|---|---|
| Model Number | IC697BEM734 |
| Bus Topology Protocol | Genius Bus System (IC660 / IC661 Block Networks) |
| Base Transmission Baud | 153.6 kbps default (fully user-configurable to alternative standard rates) |
| Hardware Node Address | Default Factory Address: 31 (software-reconfigurable via configuration utility) |
| Backplane Current Load | 1.3 Amps continuous continuous consumption drawn from the 5 V DC rail |
| Physical Interface Ports | PL1 port (Handheld Monitor alignment) | PL3 port (Genius Bus Field loop) |
| Diagnostic Array Layout | 3 physical LEDs indicating power status, active communication, and network fault |
| Climatic Thermal Range | –20°C to +60°C operational spectrum; 5% to 95% non-condensing relative humidity |
| Module Net Mass | Approximately 1.81 kg (4.0 lbs) heavy-duty industrial casing |
Installation & Maintenance Guide
Chassis Insertion and Seat Protocols
Ensure that all primary and auxiliary power to the Series 90-70 chassis rack is entirely switched off prior to handling. Align the card edge of the IC697BEM734 module with the physical tracking guides of any available rack slot. Push firmly until the backplane pins are completely seated, then tighten the upper and lower integrated chassis hardware screws to establish a path to earth ground.
Fieldbus and Handheld Tool Connection
Terminate the incoming industrial trunk line into the designated PL3 terminal connection block on the module faceplate. If field-level diagnostic sweeps or manual node configurations are required, connect an external Genius Handheld Monitor (HHM) directly into the dedicated PL1 diagnostic interface port without disrupting backplane transactions.
LED Operational State Awareness
Maintain continuous monitoring of the 3 integrated front-panel status LEDs to simplify system troubleshooting. The Power LED verifies stable backplane voltage delivery from the 5V rail. The Active LED flashes rhythmically to represent active datagram transmission across the Genius loop, while the Fault LED illuminates steady red to indicate an unaddressed communication timeout or local internal chip failure.
Engineering Advantages
- Stable Thermal Design: Built to endure extended industrial panel temperatures from –20°C to +60°C, preventing operational drift or communication dropouts under intense factory floor conditions.
- Independent Network Upgrades: Simplifies network optimization using specialized MS-DOS configuration scripts, allowing engineers to remap the default node address away from 31 without altering hardware components.
- Low System Footprint: Draws a stable 1.3 Amps at 5 V DC, keeping maximum power consumption below 6.5 Watts to minimize the heat generated inside sealed, unventilated enclosures.
- Highly Reliable Casing: Enclosed in a rugged 1.81 kg protective housing designed to insulate sensitive internal circuits from industrial electromagnetic interference (EMI) and ambient airborne dust.
Technical FAQs
Q1: Can this bus controller coexist with other network cards in the same Series 90-70 rack?
A1: Yes. The Series 90-70 VME platform supports multi-module configurations. You can install multiple IC697BEM734 controllers in a single chassis to build independent Genius field channels, provided the rack power supply has enough current capacity on the 5V DC rail.
Q2: Is the IC697BEM734 hot-swappable if a network chip component fails?
A2: No. The backplane design of the Series 90-70 PLC does not allow live hot-swapping. Removing or replacing the module while the rack is powered up can cause electrical arcs, corrupt active VME data traffic, and permanently damage the internal circuits of the module.
Q3: What cable types are recommended for connecting the PL3 field port to remote blocks?
A3: To maintain a stable 153.6 kbps transmission speed, use high-quality, low-capacitance shielded twisted-pair cables designed specifically for Genius networks. Ensure that appropriate end-of-line termination resistors match the characteristic impedance of the trunk to prevent signal reflections.
Additional Specifications
Scalar (V/f)
Vector
AC-powered
Buying Guide
- Confirm the exact model, part number, and specifications before ordering.
- Ensure compatibility with your current machinery or control systems.
- Reach out via sale@etowonauto.com or +8617859788089 for technical assistance.
- Review delivery options, lead times, and shipping requirements.
- Follow manufacturer instructions and best practices during installation.
Shipping And Return
In-stock items are typically dispatched the same business day. For products not currently in stock, dispatch times may vary based on availability. International shipping is available, and shipping costs are calculated according to destination, weight, and carrier selection.
Returns are accepted within 30 days of receipt, provided items are unused and in original condition. Return shipping costs are the responsibility of the customer. Please contact us before returning any item to receive return authorization.
For more details, please review our Shipping & Return Policy.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Fast Shipping
Original industrial automation parts available for prompt shipment worldwide.
-
Easy Returns
30-day return support with a 12-month warranty for reliable after-sales protection.
-
24/7 support
Responsive professional support to help maintain stable and efficient operations.
-
Genuine & Original
100% authentic, sourced directly from trusted industrial automation manufacturers.
Technical & Buying Guide
-
How Does Full-Lifecycle Management Optimize PLC and DCS Assets?
Traditional industrial asset management relies on manual logging and reactive troubleshooting, causing 15–20% annual ...
-
Can an Integrated Spare Chain Slash Downtime?
Unplanned equipment failures cost Chinese factories ¥636,000 per hour. Traditional cross-border spare procurement tak...
-
Why Do 30% of Automation Upgrades Fail Due to Integration Gaps?
This technical article explains how digital-intelligent fusion overcomes fragmented workshop operations using industr...
-
Why Do Heavy Industries Trust GE Fanuc PLC and DCS Systems?
This article examines how GE Fanuc core components solve reliability gaps in heavy-load factory automation. It covers...
-
How Does Bently Nevada Predict Failures 180 Days in Advance?
Standard PLC and DCS systems often miss early vibration anomalies in rotating machinery, leading to 68% of sudden mec...
-
How Does ABB Omni-Measurement Eliminate Process Safety Blind Spots?
ABB Omni-Measurement closes process safety blind spots using predictive analytics and cross-validated sensing. Real r...
