Transform your home with the latest multi-electronics solutions, from intelligent lighting to vOptimize your operations with the Bently Nevada 3500 Monitoring System, offering real-time vibration and machinery condition monitoring to prevent failures and maximize uptime.oice-controlled devices all designed to make life easier, safer, and more connected.
SKU:FC-IOCHAS-0002R
Honeywell FC-IOCHAS-0002R 19 Inch IO Chassis 3U
Manufacturer: Honeywell
Product No.: FC-IOCHAS-0002R
Product Type: I/O Chassis
Product Origin: USA
Payment:T/T, Western Union
Weight: 8700g
Shipping port: Xiamen
Warranty: 12 months
Share
- Fast Delivery
- 24/7 Support
- Quality Assurance
Description
Honeywell FC-IOCHAS-0002R Industrial IO Chassis
The Honeywell FC-IOCHAS-0002R is a 19-inch industrial IO chassis. It has 21 slots with dual 5V power inputs. This unit weighs 8.7 kg.
Technical Specifications
- Brand & Model: Honeywell FC-IOCHAS-0002R
- Power Inputs: Dual 5V, 100 mA each
- Slot 20 Power: 5V-1 power rail
- Slot 21 Power: 5V-2 power rail
- Height: 3 HE (133.4 mm)
- Width: 482.6 mm (19 inches)
- Depth: 280 mm (11 inches)
- Weight: 8.7 kg (19.2 lbs)
- Certifications: CE, UL, CSA, TÜV, FM
Key Features
- Dual 5V power inputs (100mA each)
- 19-inch 3U rack mount design
- Multiple safety certifications
- 18 IO module capacity
- 21 total slots available
- Industrial grade construction
- Ventilation ready design
Quick Installation
- Fits standard 19-inch racks
- Connect dual power inputs
- Stack additional units as needed
- Ensure proper grounding
- Allow adequate ventilation space
Shipping Options
- Fast worldwide delivery
- FedEx, UPS, DHL available
- Tracking information provided
- In stock ready to ship
Documentation
Download Detailed Product Specifications PDF
FAQ
Q: What are the power requirements?
A: Dual 5V inputs at 100 mA each for slots 20 and 21.
Q: What is the chassis height?
A: 3 HE (133.4 mm) standard 19-inch rack height.
Q: What certifications are included?
A: CE, UL, CSA, TÜV, and FM approved.
Contact
For the FC-IOCHAS-0002R chassis:
Email: sale@etowonauto.com
Additional Specifications
Scalar (V/f)
Vector
AC-powered
Buying Guide
- Confirm the exact model, part number, and specifications before ordering.
- Ensure compatibility with your current machinery or control systems.
- Reach out via sale@etowonauto.com or +8617859788089 for technical assistance.
- Review delivery options, lead times, and shipping requirements.
- Follow manufacturer instructions and best practices during installation.
Shipping And Return
In-stock items are typically dispatched the same business day. For products not currently in stock, dispatch times may vary based on availability. International shipping is available, and shipping costs are calculated according to destination, weight, and carrier selection.
Returns are accepted within 30 days of receipt, provided items are unused and in original condition. Return shipping costs are the responsibility of the customer. Please contact us before returning any item to receive return authorization.
For more details, please review our Shipping & Return Policy.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Fast Shipping
Original industrial automation parts available for prompt shipment worldwide.
-
Easy Returns
30-day return support with a 12-month warranty for reliable after-sales protection.
-
24/7 support
Responsive professional support to help maintain stable and efficient operations.
-
Genuine & Original
100% authentic, sourced directly from trusted industrial automation manufacturers.
Technical & Buying Guide
-
Can Emerson DeltaV DCS Cards Optimize Chemical Safety Loops?
This technical article examines how Emerson DeltaV DCS card upgrades address legacy control limitations in chemical p...
-
Is Partial CNC Board Replacement Better Than a Full System Upgrade?
This technical article examines the dominance of GE Fanuc CNC hardware in heavy-duty automation, supported by field d...
-
Can Genuine PLC Modules Cut DCS Downtime 60%?
This article examines how genuine Allen-Bradley PLC module replacement strategies directly reduce unplanned DCS downt...
-
Is Your GE Fanuc PLC Talking to ABB DCS?
This article reveals how cross-system data silos between GE Fanuc PLC and ABB DCS cause 8–15% production losses in pr...
-
Can Integrated PLC-DCS-TSI Fix Data Silos?
Most industrial digital twins remain static visualization tools because discrete control, process automation, and con...
-
How to Cut Power Plant Outages with ABB and GE Fanuc Retrofits?
This technical article outlines a data-driven approach to modernizing power plant control systems using a hybrid ABB ...
