Transform your home with the latest multi-electronics solutions, from intelligent lighting to vOptimize your operations with the Bently Nevada 3500 Monitoring System, offering real-time vibration and machinery condition monitoring to prevent failures and maximize uptime.oice-controlled devices all designed to make life easier, safer, and more connected.
SKU:IS215UCVGM06A
GE Mark VI Turbine Controller IS215UCVGM06A
Manufacturer: General Electric
Product No.: IS215UCVGM06A
Product Type: Controller Board
Product Origin: USA
Payment:T/T, Western Union
Weight: 1200g
Shipping port: Xiamen
Warranty: 12 months
Share
- Fast Delivery
- 24/7 Support
- Quality Assurance
Description
GE IS215UCVGM06A Controller Card
The GE IS215UCVGM06A is a UCV controller card for the Mark VI system. It manages and controls gas turbines in industrial power generation.
Core Specifications
- Brand & Model: GE IS215UCVGM06A
- Weight: Approx. 1.2 kg (2.65 lbs)
- System Series: Speedtronic Mark VI
- Product Type: UCV Controller Card
- Rack Size: 6U High, Single/Double Slot
- Operating System: QNX real-time OS
- Bus Interface: VME bus for I/O communication
- Communication Ports: Ethernet, 2× RS-232
- Primary Application: Gas turbine control
Key Features
- Runs turbine application code on QNX OS
- Communicates via VME bus with I/O boards
- Compact ~1.2 kg card design
- Ethernet port for HMI and network connection
- RS-232 ports for setup and DCS communication
- Designed for steam, gas, and LM turbines
- Part of GE Speedtronic control system
Package Contents
- One GE IS215UCVGM06A controller card
- Installation documentation
- Configuration guide
FAQ
What system does this controller belong to?
The IS215UCVGM06A is a core component of the GE Speedtronic Mark VI gas turbine control and protection system.
What is its main function?
It operates the turbine application code, processing inputs and executing control logic to manage the gas turbine's operation.
What are the communication options?
It features an Ethernet port and two RS-232 serial ports for connecting to HMIs, DCS, and other control equipment.
Additional Specifications
- Black
- Green
Scalar (V/f)
Vector
AC-powered
Buying Guide
- Confirm the exact model, part number, and specifications before ordering.
- Ensure compatibility with your current machinery or control systems.
- Reach out via sale@etowonauto.com or +8617859788089 for technical assistance.
- Review delivery options, lead times, and shipping requirements.
- Follow manufacturer instructions and best practices during installation.
Shipping And Return
In-stock items are typically dispatched the same business day. For products not currently in stock, dispatch times may vary based on availability. International shipping is available, and shipping costs are calculated according to destination, weight, and carrier selection.
Returns are accepted within 30 days of receipt, provided items are unused and in original condition. Return shipping costs are the responsibility of the customer. Please contact us before returning any item to receive return authorization.
For more details, please review our Shipping & Return Policy.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Fast Shipping
Original industrial automation parts available for prompt shipment worldwide.
-
Easy Returns
30-day return support with a 12-month warranty for reliable after-sales protection.
-
24/7 support
Responsive professional support to help maintain stable and efficient operations.
-
Genuine & Original
100% authentic, sourced directly from trusted industrial automation manufacturers.
Technical & Buying Guide
-
Can Emerson DeltaV DCS Cards Optimize Chemical Safety Loops?
This technical article examines how Emerson DeltaV DCS card upgrades address legacy control limitations in chemical p...
-
Is Partial CNC Board Replacement Better Than a Full System Upgrade?
This technical article examines the dominance of GE Fanuc CNC hardware in heavy-duty automation, supported by field d...
-
Can Genuine PLC Modules Cut DCS Downtime 60%?
This article examines how genuine Allen-Bradley PLC module replacement strategies directly reduce unplanned DCS downt...
-
Is Your GE Fanuc PLC Talking to ABB DCS?
This article reveals how cross-system data silos between GE Fanuc PLC and ABB DCS cause 8–15% production losses in pr...
-
Can Integrated PLC-DCS-TSI Fix Data Silos?
Most industrial digital twins remain static visualization tools because discrete control, process automation, and con...
-
How to Cut Power Plant Outages with ABB and GE Fanuc Retrofits?
This technical article outlines a data-driven approach to modernizing power plant control systems using a hybrid ABB ...
