Forvandle hjemmet ditt med de nyeste multi-elektroniske løsningene, fra intelligent belysning til stemmestyrte enheter – alle designet for å gjøre livet enklere, tryggere og mer tilkoblet. Optimaliser driften med Bently Nevada 3500 overvåkingssystem, som tilbyr sanntids vibrasjons- og maskintilstandsovervåking for å forhindre feil og maksimere oppetid.
SKU:IC693CBL302
15 Meter Terminated Cable IC693CBL302 GE Fanuc 90-30 PLC
Manufacturer: General Electric
Product No.: IC693CBL302
Product Type: Expansion Cable
Product Origin: USA
Payment:T/T, Western Union
Weight: 1700g
Shipping port: Xiamen
Warranty: 12 months
Del
- Rask levering
- 24/7 kundestøtte
- Kvalitetssikring
Beskrivelse
Technical Specifications
| Part Number | IC693CBL302 |
| Product Type | I/O Bus Expansion Cable (Terminated) |
| Brand / Manufacturer | GE Fanuc / Emerson |
| Product Series | Series 90-30 PLC |
| Cable Length | 15 meters (49.21 feet) |
| Cable Structure | Continuous shielded design for high signal integrity |
| First End Connector | Single Male Connector (plugs into CPU/Previous baseplate) |
| Second End Connector | Single Male Terminated Connector with Integrated Resistors |
| Built-in Termination | Yes (Eliminates need for separate external terminator plug) |
| Wye Adapter Compatibility | Not compatible (Designed strictly as end-of-line cable) |
| Max Cumulative Cable Length | 213 meters (700 feet) from CPU to the last baseplate |
| Supported Baseplates | CPU 350 to 374: Up to 7 expansion backplanes CPU 331 to 341: Up to 4 expansion backplanes |
| Recommended Replacement | 1-Year preventative maintenance interval |
| Net Product Weight | 1.70 kg (Approx. 3.75 lbs) |
Product Overview
The GE Fanuc IC693CBL302 is a 15-meter (49.21 feet) continuous shielded I/O Bus Expansion Cable designed specifically for the Series 90-30 PLC platform. Weighing approximately 1.70 kg (3.75 lbs), this heavy-duty cable is engineered exclusively to close out the last position in an I/O expansion or remote baseplate chain. By integrating terminating resistors directly inside its end connector, it completes the bus loop without requiring a standalone physical terminator plug (like the IC693ACC307) or any external Wye adapters.
Core Technical Advantages
- End-of-Line Signal Termination: Comes equipped with built-in terminating resistors inside the final male connector, eliminating signal reflection and stabilizing bus communication.
- Robust Shielded Construction: Features a continuous, high-grade shield configuration that blocks industrial electromagnetic interference (EMI) over its long 15-meter run.
- No Adapter Complexity: Direct point-to-point architecture removes the need for Wye adapters, lowering the footprint and reducing connection failure points in high-vibration panels.
- Substantial Physical Integrity: The robust 1.70 kg build provides the physical durability required to route through harsh cable trays and complex routing paths in industrial automation settings.
Installation Guide
Before installing, shut off the power to the Series 90-30 PLC rack system. Plug the first end (standard single male connector) into the I/O expansion port of your CPU baseplate or the output port of the preceding expansion baseplate in the daisy chain. Connect the second end (the connector containing the integrated resistors) into the final expansion baseplate of the system. Secure the connector mounting screws to prevent loose communication signals. Ensure the total cumulative cable run from the host CPU to the final 1.70 kg expansion cable terminal does not exceed the system maximum of 213 meters (700 feet).
Technical FAQs
Q1: Can I connect another expansion cable to the end of the IC693CBL302?
A1: No. The IC693CBL302 is designed strictly for the final baseplate in the chain. Because the terminating resistors are built directly into the second-end connector, it terminates the I/O bus and cannot be used to daisy-chain further.
Q2: Why is the maximum number of supported expansion baseplates different?
A2: The maximum number of supported expansion racks is restricted by the addressing capabilities of the system's CPU. High-performance models (such as CPU 350 to 374) support up to 7 cables/racks, while entry-level models (CPU 331 to 341) support up to 4 racks.
Q3: How much does this 15-meter cable weigh, and does it require special support?
A3: The net weight of this heavy-duty cable is 1.70 kg (3.75 lbs). Due to its weight and length, it is highly recommended to secure the cable along structural conduit trays to relieve physical strain on the PLC baseplate connector pins.
Ytterligere spesifikasjoner
Skalar (V/f)
Vektor
AC-drevet
Kjøpsveiledning
- Bekreft nøyaktig modell, delenummer og spesifikasjoner før bestilling.
- Sørg for kompatibilitet med ditt nåværende maskineri eller kontrollsystemer.
- Ta kontakt via sale@etowonauto.com eller +8617859788089 for teknisk assistanse.
- Gå gjennom leveringsalternativer, leveringstider og fraktkrav.
- Følg produsentens instruksjoner og beste praksis under installasjon.
Frakt og retur
Varer på lager sendes vanligvis samme virkedag. For produkter som ikke er på lager for øyeblikket, kan leveringstiden variere basert på tilgjengelighet. Internasjonal frakt er tilgjengelig, og fraktkostnader beregnes ut fra destinasjon, vekt og valgt transportør.
Returer godtas innen 30 dager etter mottak, forutsatt at varene er ubrukte og i original stand. Returfraktkostnader dekkes av kunden. Vennligst kontakt oss før du returnerer en vare for å få returautorisasjon.
For mer informasjon, vennligst se vår Frakt- og returpolicy.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Rask levering
Originale deler til industriell automasjon tilgjengelig for rask levering over hele verden.
-
Enkel retur
30 dagers returrett med 12 måneders garanti for pålitelig etterkjøpsbeskyttelse.
-
24/7 støtte
Responsiv profesjonell støtte for å hjelpe med å opprettholde stabile og effektive operasjoner.
-
Ekte og original
100 % autentisk, hentet direkte fra pålitelige produsenter av industriell automasjon.
Teknisk og kjøpsguide
-
Hybrid DCS/PLC: Digital Twin Fix?
This technical article examines how hybrid ABB DCS and Allen‑Bradley PLC architectures overcome data isolation and co...
-
Why Do 68% of Turbine False Trips Come from TSI-DCS Signal Mismatch
This technical article examines the critical compatibility challenges between Bently Nevada 3300/3500 TSI probes and ...
-
Cutting Multi-Vendor Downtime by 32% – Is Your Plant Ready?
Emerson Boundless Automation unifies data from ABB DCS, Allen-Bradley PLC, and GE Fanuc controllers without gateways....
-
Can Hybrid PLC-TSI Replace Expensive DCS Systems?
Small and medium refineries face critical monitoring bottlenecks with manual inspections causing 8-hour fault detecti...
-
What is the Real Cost of Corrosion on Factory Automation?
Standard automation hardware fails rapidly in corrosive heavy industries, causing significant downtime and mainten...
-
Can DCS-PLC-TSI Synergy Cut Refinery Furnace Energy Loss by 7%?
This article explains how synchronizing Distributed Control Systems, Programmable Logic Controllers, and Turbine Supe...
