Transform your home with the latest multi-electronics solutions, from intelligent lighting to vOptimize your operations with the Bently Nevada 3500 Monitoring System, offering real-time vibration and machinery condition monitoring to prevent failures and maximize uptime.oice-controlled devices all designed to make life easier, safer, and more connected.
SKU:IC660CBB902
IC660CBB902 GE Fanuc Series 6 PLC Bus Controller
Manufacturer: General Electric
Product No.: IC660CBB902
Product Type: Bus Controller Module
Product Origin: USA
Payment:T/T, Western Union
Weight: 350g
Shipping port: Xiamen
Warranty: 12 months
Share
- Fast Delivery
- 24/7 Support
- Quality Assurance
Description
GE Fanuc IC660CBB902 Bus Controller
The GE Fanuc IC660CBB902 is a Series 6 PLC bus controller. It interfaces Series 6 PLCs to Genius I/O buses. This controller supports up to 31 I/O devices.
Technical Specifications
- Brand & Model: GE Fanuc IC660CBB902
- Application: Series 6 PLC System
- I/O Capacity: 31 devices max (blocks, monitors, interfaces)
- Phase Type: Phase B enhanced
- Baud Rate: Selectable (except 153.6 kbaud standard)
- Distance: 2000 feet maximum connection
- Diagnostics: Built-in diagnostics
- Compatibility: Genius I/O blocks >64 I/O bits, RTD blocks
- Installation: CPU slot, I/O rack, remote rack
- LEDs: BOARD OK and COMM OK indicators
- Terminals: 4 upper terminals for bus connection
- Jumpers: JP1, JP2, JP3 for bus termination
- Configuration: CPU or handheld monitor
- Weight: 0.35 kg (0.77 lbs)
Key Features
- Supports up to 31 I/O devices on Genius bus
- Phase B enhanced bus controller
- Built-in diagnostic reporting to CPU
- 2000 feet maximum connection distance
- Works with Genius blocks >64 I/O bits
- Compatible with RTD (Resistive Temperature Detector) blocks
- BOARD OK and COMM OK LED indicators
- Handheld monitor connector
- Flexible installation in CPU or I/O racks
- Selectable baud rates (except 153.6 kbaud standard)
System Integration
- Interfaces Series 6 PLC with Genius I/O bus
- Supports CPU-to-CPU communication systems
- Compatible with bus redundancy configurations
- Automatic diagnostic reports from I/O blocks
Installation
- Install in CPU slot or I/O rack
- Use jumpers JP1, JP2, JP3 for bus termination
- Maximum 2000 feet bus length
- Package includes IC660CBB902 controller
- Shipping via FedEx, UPS, DHL
FAQ
Q: How many I/O devices supported?
A: IC660CBB902 supports up to 31 I/O devices.
Q: What is the maximum distance?
A: 2000 feet maximum connection distance.
Q: Does it have diagnostics?
A: Yes, built-in diagnostic capabilities.
Contact
For the IC660CBB902 bus controller:
Email: sale@etowonauto.com
Additional Specifications
- Black
- Green
Scalar (V/f)
Vector
AC-powered
Buying Guide
- Confirm the exact model, part number, and specifications before ordering.
- Ensure compatibility with your current machinery or control systems.
- Reach out via sale@etowonauto.com or +8617859788089 for technical assistance.
- Review delivery options, lead times, and shipping requirements.
- Follow manufacturer instructions and best practices during installation.
Shipping And Return
In-stock items are typically dispatched the same business day. For products not currently in stock, dispatch times may vary based on availability. International shipping is available, and shipping costs are calculated according to destination, weight, and carrier selection.
Returns are accepted within 30 days of receipt, provided items are unused and in original condition. Return shipping costs are the responsibility of the customer. Please contact us before returning any item to receive return authorization.
For more details, please review our Shipping & Return Policy.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Fast Shipping
Original industrial automation parts available for prompt shipment worldwide.
-
Easy Returns
30-day return support with a 12-month warranty for reliable after-sales protection.
-
24/7 support
Responsive professional support to help maintain stable and efficient operations.
-
Genuine & Original
100% authentic, sourced directly from trusted industrial automation manufacturers.
Technical & Buying Guide
-
How does hierarchical control raise factory OEE from 64% to 82%?
This article explains how hierarchical cloud-edge collaborative control replaces fragmented industrial architectures....
-
Can DCS Intelligent Regulation Fix Thermal Power Energy Imbalance?
This article explains how intelligent DCS regulation with MPC and cloud-based control solves energy-production imbala...
-
Can Continuous Automation Iteration Cut Factory Costs by 18-25%?
Static industrial control systems create hidden annual cost increases of 18-25%. Phased PLC and DCS program iteration...
-
Can Anti-Interference Hardware End 38% of Automation Downtime?
Field data from chemical, wind, and automotive plants proves that industrial hardware with full IEC 61000-4 EMC certi...
-
How Does Full-Lifecycle Management Optimize PLC and DCS Assets?
Traditional industrial asset management relies on manual logging and reactive troubleshooting, causing 15–20% annual ...
-
Can an Integrated Spare Chain Slash Downtime?
Unplanned equipment failures cost Chinese factories ¥636,000 per hour. Traditional cross-border spare procurement tak...
