Transform your home with the latest multi-electronics solutions, from intelligent lighting to vOptimize your operations with the Bently Nevada 3500 Monitoring System, offering real-time vibration and machinery condition monitoring to prevent failures and maximize uptime.oice-controlled devices all designed to make life easier, safer, and more connected.
SKU:HIEE205012R1
HIEE205012R1 UNC4672A V1 ABB Measuring Interface Unit
Manufacturer: ABB
Product No.: HIEE205012R1
Product Type: Interface Unit
Product Origin: Sweden
Payment:T/T, Western Union
Weight: 550g
Shipping port: Xiamen
Warranty: 12 months
Share
- Fast Delivery
- 24/7 Support
- Quality Assurance
Description
ABB UNC4672A V1 Measuring Interface Unit
The ABB UNC4672A V1 is a compact measuring interface unit for industrial automation. It converts digital and analog input signals into stable 4-20 mA outputs and Modbus RTU streams, protecting control systems from field noise.
Key Advantages
- Galvanic Isolation: Prevents ground loops and signal interference.
- Modbus RTU: Supports direct RS-485 integration and remote diagnostics.
- IP54 Housing: Ensures durable operation in harsh plant environments.
Technical Specifications
| Input / Output | Digital & Analog Input / 4-20 mA Output |
| Communication | Modbus RTU (RS-485) |
| Power Supply | 90-240 V AC (50/60 Hz) |
| Ratings & MTBF | IP54 / > 200,000 hours |
| Environment | -20°C to +50°C / 5% to 95% RH (non-condensing) |
| Physical Details | 150 mm x 250 mm x 45 mm / 0.55 kg / Wall-mounted |
Quick Installation
- Mounting: Wall-mount vertically with 50 mm clearance for cooling.
- Wiring: Use shielded twisted-pair cables; ground the shield at one point.
- Bus Network: Install a 120 Ω termination resistor at the RS-485 bus ends.
Technical FAQs
Q1: How to fix Modbus connection faults?
A1: Check that baud rate, parity, and station ID match. Ensure the 120 Ω resistor is installed.
Q2: Is external loop power required for the 4-20 mA output?
A2: No. The output loop is actively powered by the unit's 90-240 V AC supply.
Q3: Can it operate in high-humidity areas?
A3: Yes. It runs reliably in non-condensing environments up to 95% relative humidity.
Additional Specifications
Scalar (V/f)
Vector
AC-powered
Buying Guide
- Confirm the exact model, part number, and specifications before ordering.
- Ensure compatibility with your current machinery or control systems.
- Reach out via sale@etowonauto.com or +8617859788089 for technical assistance.
- Review delivery options, lead times, and shipping requirements.
- Follow manufacturer instructions and best practices during installation.
Shipping And Return
In-stock items are typically dispatched the same business day. For products not currently in stock, dispatch times may vary based on availability. International shipping is available, and shipping costs are calculated according to destination, weight, and carrier selection.
Returns are accepted within 30 days of receipt, provided items are unused and in original condition. Return shipping costs are the responsibility of the customer. Please contact us before returning any item to receive return authorization.
For more details, please review our Shipping & Return Policy.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Fast Shipping
Original industrial automation parts available for prompt shipment worldwide.
-
Easy Returns
30-day return support with a 12-month warranty for reliable after-sales protection.
-
24/7 support
Responsive professional support to help maintain stable and efficient operations.
-
Genuine & Original
100% authentic, sourced directly from trusted industrial automation manufacturers.
Technical & Buying Guide
-
How to Solve PLC and DCS Faults in Industrial Automation?
Unplanned downtime in manufacturing is frequently traced to failures in PLC, DCS, and TSI systems, costing medium-siz...
-
How Does ABB System 800xA Enable Cost-Effective DCS Modernization?
This technical article examines a hybrid multi-brand DCS retrofit strategy centered on ABB System 800xA for petrochem...
-
Can a Multi-Vendor PM Checklist Cut PLC Downtime?
This article presents a standardized annual preventive maintenance checklist for mixed-vendor industrial control envi...
-
Why Emerson Hot Redundancy Retrofit Slashes Downtime by 96%?
Process plants relying on GE Fanuc single PLCs face 47% of unplanned outages from controller failure, costing $38,000...
-
Cut Migration Engineering Hours by 60% – How Does It Work?
This technical guide examines the operational risks and engineering overhead of maintaining separate GE Proficy HMI a...
-
Is Your 1756 Supply Chain Risking Production?
Counterfeit 1756 modules cause 68% of unplanned PLC downtime. This guide covers a four-step verification method, real...
