Canza gidanka da sabbin hanyoyin na’urorin lantarki masu yawa, daga hasken wuta mai hankali zuwa inganta ayyukanka da Bently Nevada 3500 Monitoring System, wanda ke ba da sa ido a ainihin lokaci kan girgiza da yanayin na’urorin injina don hana gazawa da ƙara lokacin aiki, da na’urorin da ake sarrafa su da murya duk an ƙera su ne don sauƙaƙa rayuwa, ƙara tsaro, da ƙarfafa haɗin kai.
SKU:IS200EROCH1A
IS200EROCH1A GE Exciter Regulator Options Card EX2100 Series
Manufacturer: General Electric
Product No.: IS200EROCH1A
Product Type: Option Board
Product Origin: USA
Payment:T/T, Western Union
Weight: 230g
Shipping port: Xiamen
Warranty: 12 months
Raba
- Isarwa Cikin Gaggawa
- Tallafi na awa 24 a rana, kwana 7 a mako
- Tabbacin Inganci
Bayani
Technical Specifications
| Manufacturer / Brand | General Electric (GE Energy / Industrial Systems) |
| Product Series | EX2100 Excitation Turbine Control Systems |
| Part Number / Functional Acronym | IS200EROCH1A (EROC) |
| Product Type | Exciter Regulator Options Card |
| Channel Count & Capacitors | 24 Channels | 4 High-Voltage Electrolytic Capacitors |
| Backplane / Slot Compatibility | Two Backplane Connectors (Mounts in IS200ERBP Simplex / IS200ERRB Redundant) |
| Interface Ports & Communication | Keypad Ports (Faceplate & Backplane), 9-pin Tool Port (RS-232C, 1200–38.4K baud), ISBUS Connectors |
| Power Output & Primary Function | Supplies +70 V DC to ECTB contact section | Ground leakage resistance detection |
| Operating Temperature | 0°C to +45°C |
| Dimensions & Weight | 15.9 cm H x 17.8 cm W | Approx. 0.23 kg (0.50 lbs) |
| Manual Reference | GEI-100526A |
Product Overview
The General Electric IS200EROCH1A is a lightweight Exciter Regulator Options Card (EROC), weighing approximately 0.23 kg (0.50 lbs), developed for GE EX2100 Excitation Systems. Measuring 15.9 cm high by 17.8 cm wide, this 24-channel module mounts into IS200ERBP or IS200ERRB backplanes. It manages ground detector interfaces, keypad data transmission, tool connectivity to the DSPX processor, and supplies +70 V DC power to the IS200ECTB terminal board.
Key Features
- Multi-Location Keypad Interface: Provides keypad data transmission to both faceplate and backplane ports for versatile mounting configurations.
- RS-232C Tool Connectivity: Features a faceplate 9-pin connector supporting 1200 to 38.4K baud to interface external computers with the DSPX processor.
- Ground Leakage Detection: Connects with the GE IS200ERGTH1A or 3rd-party ground detectors to find resistance leakages to ground in generator field currents.
- Onboard Power Supply: Delivers positive 70 V DC power directly to the contact output section of the IS200ECTB terminal board.
Installation Essentials
Slide the IS200EROCH1A into its assigned slot on the IS200ERBP (Simplex) or IS200ERRB (Redundant) backplane until the two backplane connectors mate securely. Verify proper slot assignment so the onboard ID device correctly communicates barcode serial and revision data with M1 or M2 controls. Ensure operating ambient temperatures remain between 0°C and +45°C.
Technical FAQs
Q1: What does the GE IS200EROCH1A card do?
A1: It supports ground leakage detection, keypad data, tool connections, and +70V DC power in EX2100.
Q2: What is the size and weight of this card?
A2: It measures 15.9 cm x 17.8 cm and weighs approximately 0.23 kg (0.50 lbs).
Q3: Which backplanes support the IS200EROCH1A?
A3: It mounts into IS200ERBP simplex or IS200ERRB redundant backplane slots.
Ƙarin ƙayyadaddun bayanai
- Kore
Sikeli (V/f)
Vector
mai amfani da wutar AC
Jagorar Sayi
- Tabbatar da ainihin samfurin, lambar ɓangare, da ƙayyadaddun bayanai kafin yin oda.
- Tabbatar da jituwa da injin ko tsarin kula da kake amfani da su a yanzu.
- Tuntuɓe mu ta sale@etowonauto.com ko +8617859788089 don taimakon fasaha.
- Duba zaɓuɓɓukan isarwa, lokacin jagora, da buƙatun jigilar kaya.
- Bi umarnin masana’anta da mafi kyawun hanyoyin aiki yayin girkawa.
Isarwa da Mayar da Kaya
Kayayyakin da ke cikin sito yawanci ana tura su a cikin wannan ranar aikin. Ga kayayyakin da ba sa cikin sito a yanzu, lokacin tura su na iya bambanta bisa ga samuwa. Ana ba da jigilar kaya zuwa ƙasashen waje, kuma ana ƙididdige kuɗin jigila bisa wurin da ake aikawa, nauyi, da kamfanin sufuri da aka zaɓa.
Ana karɓar mayar da kaya cikin kwanaki 30 bayan karɓa, muddin kayan ba a yi amfani da su ba kuma suna cikin yanayin da suka fito daga masana’anta. Kuɗin jigilar mayar da kaya nauyi ne a kan abokin ciniki. Da fatan za a tuntube mu kafin ku mayar da duk wani kaya domin samun izinin mayarwa.
Don ƙarin bayani, don Allah ku duba Manufar Jigila & Mayar da Kaya.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Isarwa cikin gaggawa
Sassan kayan otomeshan na masana’antu na ainihi suna nan a shirye don aikawa cikin gaggawa a ko’ina cikin duniya.
-
Mayar da kaya cikin sauƙi
Tallafin mayar da kaya na kwanaki 30 tare da garantin watanni 12 don tabbatacciyar kariya bayan saye.
-
Taimako a kowane lokaci (24/7)
Tallafin ƙwararru mai saurin amsawa don taimakawa kiyaye ayyuka cikin kwanciyar hankali da inganci.
-
Na Gaskiya & Asali
Kashi 100% na asali ne, ana samar da su kai tsaye daga amintattun masana’antun kayan sarrafa masana’antu.
Jagorar Fasaha da Siyarwa
-
Why Hybrid AB PLC + ABB DCS Beat Single-Vendor Systems?
This article examines how hybrid integration of Allen‑Bradley PLC and ABB DCS overcomes single-vendor limitations in ...
-
PLC, DCS, or TSI: Which Controls Fit Your Plant?
This article reviews five trusted industrial control system combinations from Allen‑Bradley, ABB, Emerson, GE Fanuc, ...
-
How to Integrate GE Fanuc PLC with ABB DCS Using OPC UA?
This article delivers a practical guide for integrating GE Fanuc PLCs with ABB DCS using OPC UA in Industry 4.0 envir...
-
Can DCS-PLC Integration Cut Chemical Plant Downtime by 37%?
This technical article examines how strategic integration of Emerson DeltaV DCS and Allen-Bradley PLC resolves instab...
-
How to Source Genuine PLC/DCS Spares and Avoid Counterfeit Risks?
Global manufacturers face rising counterfeit PLC and DCS modules that cause signal deviations, unplanned failures, an...
-
Can Bently Nevada-PLC-DCS Integration End Unplanned Downtime?
This article examines how integrating Bently Nevada TSI sensors with PLC and DCS systems resolves industrial data fra...
