Canza gidanka da sabbin hanyoyin na’urorin lantarki masu yawa, daga hasken wuta mai hankali zuwa inganta ayyukanka da Bently Nevada 3500 Monitoring System, wanda ke ba da sa ido a ainihin lokaci kan girgiza da yanayin na’urorin injina don hana gazawa da ƙara lokacin aiki, da na’urorin da ake sarrafa su da murya duk an ƙera su ne don sauƙaƙa rayuwa, ƙara tsaro, da ƙarfafa haɗin kai.
SKU:IC693CPU370
GE Fanuc IC693CPU370 CPU Module 133MHz 240KB 32-bit
Manufacturer: General Electric
Product No.: IC693CPU370
Product Type: CPU Module
Product Origin: USA
Payment:T/T, Western Union
Weight: 500g
Shipping port: Xiamen
Warranty: 12 months
Raba
- Isarwa Cikin Gaggawa
- Tallafi na awa 24 a rana, kwana 7 a mako
- Tabbacin Inganci
Bayani
GE Fanuc IC693CPU370 Series 90-30 CPU Module
The GE Fanuc IC693CPU370 is a 32-bit PLC CPU module for the Series 90-30 system. Powered by an 80386EX processor (AMD SC520) running at 133 MHz, this module delivers 240 KB of register memory and supports floating point math. It handles up to 4096 total I/O points, including 2048 analog I/O. Weighing approximately 0.5 kg (1.10 lbs), it consumes 7.4 W at 5 V DC.
Technical Specifications
| Parameter | Value |
|---|---|
| Manufacturer | GE Fanuc |
| Series | Series 90-30 |
| Part Number | IC693CPU370 |
| System Type | 32-bit PLC CPU |
| Processor Model | 80386EX (AMD SC520) |
| Processor Speed | 133 MHz |
| Register Memory | 240 KB |
| Maximum Total I/O | 4096 points |
| Analog I/O Capacity | 2048 points |
| Floating Point Math | Supported |
| Timers & Counters | 2000 units |
| Internal Coils | 3096 bits |
| Temporary Coils | 256 bits |
| System Registers | 28 words |
| Power Consumption | 7.4 W @ 5 V DC |
| Battery-Backed Clock | Included |
| Backup Battery Operation | 30+ days data retention |
| Weight | Approx. 0.5 kg (1.10 lbs) |
Model Number Breakdown
- IC693 – GE Fanuc Series 90-30 PLC Compatible
- CPU – Central Processing Unit
- 370 – 133 MHz, 240 KB, 80386EX Variant
Communication & Compatibility
- Serial Ports: None on CPU (RS-485 available via power supply)
- Ethernet Communication: Requires external Ethernet module
- EZ Program Store Device: Requires Ethernet connection
- Handheld Programmer: Not supported
Installation & Field Application Guide
- Install the CPU module in slot 0 of the Series 90-30 rack. Ensure the backplane power supply provides 7.4 W minimum.
- Connect RS-485 serial communication via the power supply connector for programming or HMI connection.
- For Ethernet connectivity, install an external Ethernet module (e.g., IC693CMM321) in an adjacent slot.
- Configure the CPU using GE Fanuc programming software. Set memory allocation, scan timing, and I/O mapping.
Why Choose the IC693CPU370
- 133 MHz 80386EX processor delivers high-speed logic execution.
- 240 KB register memory supports large control programs.
- Supports up to 4096 total I/O and 2048 analog I/O points.
- Battery-backed clock and 30+ day data retention ensure reliable operation.
Field Engineer FAQs
Q1: What is the scan time of the IC693CPU370?
A1: The typical scan time is 0.4 ms per 1K of logic, depending on program complexity and I/O configuration.
Q2: Can this CPU connect to an HMI without an Ethernet module?
A2: Yes, via the RS-485 port available through the power supply using GE Fanuc SNP or Modbus RTU protocols.
Q3: What type of battery is used for the clock and data retention?
A3: The IC693CPU370 uses a 3V lithium coin cell (replaceable) that provides over 30 days of data retention without external power.
Inquiries: sale@etowonauto.com
Ƙarin ƙayyadaddun bayanai
Sikeli (V/f)
Vector
mai amfani da wutar AC
Jagorar Sayi
- Tabbatar da ainihin samfurin, lambar ɓangare, da ƙayyadaddun bayanai kafin yin oda.
- Tabbatar da jituwa da injin ko tsarin kula da kake amfani da su a yanzu.
- Tuntuɓe mu ta sale@etowonauto.com ko +8617859788089 don taimakon fasaha.
- Duba zaɓuɓɓukan isarwa, lokacin jagora, da buƙatun jigilar kaya.
- Bi umarnin masana’anta da mafi kyawun hanyoyin aiki yayin girkawa.
Isarwa da Mayar da Kaya
Kayayyakin da ke cikin sito yawanci ana tura su a cikin wannan ranar aikin. Ga kayayyakin da ba sa cikin sito a yanzu, lokacin tura su na iya bambanta bisa ga samuwa. Ana ba da jigilar kaya zuwa ƙasashen waje, kuma ana ƙididdige kuɗin jigila bisa wurin da ake aikawa, nauyi, da kamfanin sufuri da aka zaɓa.
Ana karɓar mayar da kaya cikin kwanaki 30 bayan karɓa, muddin kayan ba a yi amfani da su ba kuma suna cikin yanayin da suka fito daga masana’anta. Kuɗin jigilar mayar da kaya nauyi ne a kan abokin ciniki. Da fatan za a tuntube mu kafin ku mayar da duk wani kaya domin samun izinin mayarwa.
Don ƙarin bayani, don Allah ku duba Manufar Jigila & Mayar da Kaya.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Isarwa cikin gaggawa
Sassan kayan otomeshan na masana’antu na ainihi suna nan a shirye don aikawa cikin gaggawa a ko’ina cikin duniya.
-
Mayar da kaya cikin sauƙi
Tallafin mayar da kaya na kwanaki 30 tare da garantin watanni 12 don tabbatacciyar kariya bayan saye.
-
Taimako a kowane lokaci (24/7)
Tallafin ƙwararru mai saurin amsawa don taimakawa kiyaye ayyuka cikin kwanciyar hankali da inganci.
-
Na Gaskiya & Asali
Kashi 100% na asali ne, ana samar da su kai tsaye daga amintattun masana’antun kayan sarrafa masana’antu.
Jagorar Fasaha da Siyarwa
-
What Are the Hidden Costs of Fake PLC and DCS Modules?
This guide presents data-driven verification protocols for imported industrial control spare parts, addressing the es...
-
Redundant PLC + DCS: 18.6% Fan Energy Savings?
This case study documents a full automation retrofit for a 300 TPD waste incineration plant. By integrating Emerson D...
-
Can Proper Warehousing Cut Automation Hardware Failures 80%?
This technical guide presents quantified storage and maintenance standards for industrial PLC, DCS, and TSI spare par...
-
Can Industrial Control Upgrades Cut Unplanned Downtime by 90%?
This article examines why legacy PLC, DCS, and vibration monitoring systems demand urgent retrofit in 2026. Citing re...
-
How to streamline industrial automation spare parts import clearance?
This guide delivers a data-driven framework for sourcing and clearing industrial automation spare parts, covering PLC...
-
How Fast Must DCS Switchover Be to Prevent Costly Process Upsets?
This article presents quantified DCS redundancy strategies using real 2024–2025 plant data. It details sub-100ms swit...
