Canza gidanka da sabbin hanyoyin na’urorin lantarki masu yawa, daga hasken wuta mai hankali zuwa inganta ayyukanka da Bently Nevada 3500 Monitoring System, wanda ke ba da sa ido a ainihin lokaci kan girgiza da yanayin na’urorin injina don hana gazawa da ƙara lokacin aiki, da na’urorin da ake sarrafa su da murya duk an ƙera su ne don sauƙaƙa rayuwa, ƙara tsaro, da ƙarfafa haɗin kai.
SKU:DS200TCDAG1BDB
DS200TCDAG1BDB General Electric Digital Input Output Board
Manufacturer: General Electric
Product No.: DS200TCDAG1BDB
Product Type: I/O Board
Product Origin: USA
Payment:T/T, Western Union
Weight: 450g
Shipping port: Xiamen
Warranty: 12 months
Raba
- Isarwa Cikin Gaggawa
- Tallafi na awa 24 a rana, kwana 7 a mako
- Tabbacin Inganci
Bayani
General Electric DS200TCDAG1BDB Technical Overview
The General Electric DS200TCDAG1BDB (TCDA) is a surface-mount Digital I/O Board manufactured by GE as part of the Speedtronic Mark V and Mark V LM turbine control system series. Weighing approximately 0.45 kg (0.99 lbs) with compact dimensions of 15.9 cm x 17.8 cm, this board serves as a primary contact input and relay output interface housed within the <R1>, <Q11>, <Q21>, and <Q51> cores. It processes digital contact input signals from DTBA and DTBB terminal boards and manages relay outputs sent to TCRA boards via the IONET communications network.
Part Number Breakdown
- DS200: GE Speedtronic Mark V System Standard Factory Assembly
- TCDA: Functional Acronym Designator — Digital I/O Board
- G1: Group 1 Standard Functional Circuit Series
- BDB: Product Revision Level — 3 Significant Revisions (Backwards-Compatible with 1st Two Revisions)
Technical Specifications Table
| Parameter | Specification |
|---|---|
| Manufacturer / Brand | General Electric (GE) |
| Full Catalog Number | DS200TCDAG1BDB |
| System Series & Product Type | Speedtronic Mark V / Mark V LM Digital I/O Board (TCDA) |
| Power Requirements & Relay Supply | +5 VDC @ 6 A Logic Power / 28 VDC Power Supply Voltage |
| Number of Relay Channels | 12 Relay Output Channels |
| Mounting Method & Dimensions | DIN-Rail Mounting / 15.9 cm H x 17.8 cm W (6.26 in x 7.0 in) |
| Operating Temperature Range | -30°C to +65°C (-22°F to +149°F) |
| Onboard Jumpers & Connectors | Jumpers J1–J8 (IONET ID, Stall Timer) / Connectors JP, JQ, JR, JO1, JO2, JX1, JX2 |
| Weight (approx.) & Documentation | 0.45 kg (0.99 lbs) / Manual Reference GEI-100182B |
Key Features & Hardware Configurations
The GE DS200TCDAG1BDB features eight hardware jumpers (J1 through J8) for board-level configuration, including J4–J6 for IONET ID addressing, J2–J3 for IONET termination resistors, J7 for stall timer enable, and J8 for test functions. Weighing approximately 0.45 kg, it is equipped with onboard diagnostic LED indicators, resistor networks, voltage-limiting capacitors, and relays. Dedicated plug connectors (JQ, JR, JO1, JO2, JX1/JX2) allow seamless signal routing between DTBA/DTBB input terminal boards, TCRA output boards, and TCEA communication modules.
Frequently Asked Questions (FAQs)
Q1: What is the power requirement for the DS200TCDAG1BDB board?
A1: The board requires +5 VDC at 6 A for logic power and operates with a 28 VDC power supply voltage.
Q2: Which jumpers control the IONET settings on this TCDA board?
A2: Jumpers J2 and J3 control IONET termination resistors, while J4, J5, and J6 set the board's IONET ID address.
Q3: How many relay channels does the DS200TCDAG1BDB provide?
A3: The board includes 12 dedicated relay channels for solenoid and output contact control.
Ƙarin ƙayyadaddun bayanai
Sikeli (V/f)
Vector
mai amfani da wutar AC
Jagorar Sayi
- Tabbatar da ainihin samfurin, lambar ɓangare, da ƙayyadaddun bayanai kafin yin oda.
- Tabbatar da jituwa da injin ko tsarin kula da kake amfani da su a yanzu.
- Tuntuɓe mu ta sale@etowonauto.com ko +8617859788089 don taimakon fasaha.
- Duba zaɓuɓɓukan isarwa, lokacin jagora, da buƙatun jigilar kaya.
- Bi umarnin masana’anta da mafi kyawun hanyoyin aiki yayin girkawa.
Isarwa da Mayar da Kaya
Kayayyakin da ke cikin sito yawanci ana tura su a cikin wannan ranar aikin. Ga kayayyakin da ba sa cikin sito a yanzu, lokacin tura su na iya bambanta bisa ga samuwa. Ana ba da jigilar kaya zuwa ƙasashen waje, kuma ana ƙididdige kuɗin jigila bisa wurin da ake aikawa, nauyi, da kamfanin sufuri da aka zaɓa.
Ana karɓar mayar da kaya cikin kwanaki 30 bayan karɓa, muddin kayan ba a yi amfani da su ba kuma suna cikin yanayin da suka fito daga masana’anta. Kuɗin jigilar mayar da kaya nauyi ne a kan abokin ciniki. Da fatan za a tuntube mu kafin ku mayar da duk wani kaya domin samun izinin mayarwa.
Don ƙarin bayani, don Allah ku duba Manufar Jigila & Mayar da Kaya.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Isarwa cikin gaggawa
Sassan kayan otomeshan na masana’antu na ainihi suna nan a shirye don aikawa cikin gaggawa a ko’ina cikin duniya.
-
Mayar da kaya cikin sauƙi
Tallafin mayar da kaya na kwanaki 30 tare da garantin watanni 12 don tabbatacciyar kariya bayan saye.
-
Taimako a kowane lokaci (24/7)
Tallafin ƙwararru mai saurin amsawa don taimakawa kiyaye ayyuka cikin kwanciyar hankali da inganci.
-
Na Gaskiya & Asali
Kashi 100% na asali ne, ana samar da su kai tsaye daga amintattun masana’antun kayan sarrafa masana’antu.
Jagorar Fasaha da Siyarwa
-
How Does TSI Integration Reduce Turbine False Trip Risks?
This article examines data-driven turbine safety monitoring and mechanical fault diagnosis within industrial automati...
-
Can turn-key automation services really cut plant downtime by 47%?
This article examines how fragmented PLC, DCS, TSI, and power-protection systems drive hidden operational losses in p...
-
Is Your Manufacturing Execution Still Stuck in Open-Loop Mode?
This article examines how closed-loop automated control resolves the critical disconnect between production planning ...
-
Can Predictive Analytics Cut Factory Automation Downtime?
This article examines how predictive abnormality pre-judgment technology addresses the economic burden of reactive fa...
-
Is Full PLC Replacement Best for Brown-Field Automation?
This technical article analyzes the hidden costs of full-scale PLC and DCS hardware replacement in brown-field plants...
-
Is Your DCS Logic Tuning Ready for Real-World Production Loads?
This article examines the critical role of physical on-site commissioning and logic tuning in industrial automation, ...
