Canza gidanka da sabbin hanyoyin na’urorin lantarki masu yawa, daga hasken wuta mai hankali zuwa inganta ayyukanka da Bently Nevada 3500 Monitoring System, wanda ke ba da sa ido a ainihin lokaci kan girgiza da yanayin na’urorin injina don hana gazawa da ƙara lokacin aiki, da na’urorin da ake sarrafa su da murya duk an ƙera su ne don sauƙaƙa rayuwa, ƙara tsaro, da ƙarfafa haɗin kai.
SKU:129478-01
Bently Nevada 3500/15 129478-01 HV DC PIM 88-140V 2.5A
Manufacturer: Bently Nevada
Product No.: 129478-01
Product Type: Power Supply Module
Product Origin: USA
Payment:T/T, Western Union
Weight: 340g
Shipping port: Xiamen
Warranty: 12 months
Raba
- Isarwa Cikin Gaggawa
- Tallafi na awa 24 a rana, kwana 7 a mako
- Tabbacin Inganci
Bayani
Bently Nevada 3500/15 129478-01 High Voltage DC Power Input Module
Product Overview
Bently Nevada 3500/15 129478-01 is a high voltage DC power input module (PIM) for 3500 rack systems. Input voltage 88 to 140 V DC. Full rack current draw 2.5 A maximum. Used with High Voltage DC Power Supply. Module weight 0.34 kg.
Technical Specifications
| Parameter | Value |
|---|---|
| Manufacturer | Bently Nevada |
| Product Number | 3500/15 129478-01 |
| Product Type | High Voltage DC Power Input Module |
| Input Voltage | 88 to 140 V DC |
| Full Rack Current Draw | 2.5 A maximum |
| Minimum Loading | No minimum rack load required |
| Operating Temperature | -30°C to +65°C |
| Storage Temperature | -40°C to +85°C |
| Humidity | 95% non-condensing |
| Dimensions (H x W x D) | 120.7 x 25.4 x 114.3 mm |
| Weight | 0.34 kg |
Key Features
- High voltage DC input 88 to 140 V DC
- 2.5 A maximum full rack current draw
- Half-height module directly behind power supply
- No minimum rack load required
- Under-voltage does not harm supply or PIM
- Over-voltage causes fuse to open on PIM
- Supply OK front panel LED indicator
Rack Configuration
- Two half-height slots on left side of rack
- Each slot accommodates one power supply
- Both slots can hold power supplies simultaneously for redundancy
Installation & Wiring Guide
Wiring Checklist: Verify DC source voltage between 88-140V before connection. Use appropriately rated DC circuit breaker. Connect positive to + terminal, negative to - terminal. Torque terminal screws to 0.56 Nm. Install PIM directly behind associated power supply slot. Under-voltage does not damage module. Over-voltage opens internal PIM fuse.
Grounding: Connect rack ground terminal to plant earth ground using #10 AWG wire. Keep DC power cables away from signal wiring. Rack must have proper earth ground before power application.
Redundancy: Install two PIMs with two power supplies for redundant DC feed. Each PIM occupies one slot. Both can operate simultaneously. During replacement, remove failed unit after isolating DC source. Spare PIM slides directly in without rack power removal.
FAQs
Q1: What voltage range does 129478-01 accept?
A1: 88 to 140 V DC. Verify voltage at source terminals before connecting module. Over-voltage opens internal PIM fuse.
Q2: What torque for terminal connections?
A2: Torque terminal screws to 0.56 Nm. Loose connections cause voltage drop and heating. Use ring terminals for stranded wire.
Q3: Can I hot-swap the PIM?
A3: No. Isolate DC source before removal. Rack does not need power down. Replace failed PIM by sliding new unit into same slot.
Ƙarin ƙayyadaddun bayanai
Sikeli (V/f)
Vector
mai amfani da wutar AC
Jagorar Sayi
- Tabbatar da ainihin samfurin, lambar ɓangare, da ƙayyadaddun bayanai kafin yin oda.
- Tabbatar da jituwa da injin ko tsarin kula da kake amfani da su a yanzu.
- Tuntuɓe mu ta sale@etowonauto.com ko +8617859788089 don taimakon fasaha.
- Duba zaɓuɓɓukan isarwa, lokacin jagora, da buƙatun jigilar kaya.
- Bi umarnin masana’anta da mafi kyawun hanyoyin aiki yayin girkawa.
Isarwa da Mayar da Kaya
Kayayyakin da ke cikin sito yawanci ana tura su a cikin wannan ranar aikin. Ga kayayyakin da ba sa cikin sito a yanzu, lokacin tura su na iya bambanta bisa ga samuwa. Ana ba da jigilar kaya zuwa ƙasashen waje, kuma ana ƙididdige kuɗin jigila bisa wurin da ake aikawa, nauyi, da kamfanin sufuri da aka zaɓa.
Ana karɓar mayar da kaya cikin kwanaki 30 bayan karɓa, muddin kayan ba a yi amfani da su ba kuma suna cikin yanayin da suka fito daga masana’anta. Kuɗin jigilar mayar da kaya nauyi ne a kan abokin ciniki. Da fatan za a tuntube mu kafin ku mayar da duk wani kaya domin samun izinin mayarwa.
Don ƙarin bayani, don Allah ku duba Manufar Jigila & Mayar da Kaya.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Isarwa cikin gaggawa
Sassan kayan otomeshan na masana’antu na ainihi suna nan a shirye don aikawa cikin gaggawa a ko’ina cikin duniya.
-
Mayar da kaya cikin sauƙi
Tallafin mayar da kaya na kwanaki 30 tare da garantin watanni 12 don tabbatacciyar kariya bayan saye.
-
Taimako a kowane lokaci (24/7)
Tallafin ƙwararru mai saurin amsawa don taimakawa kiyaye ayyuka cikin kwanciyar hankali da inganci.
-
Na Gaskiya & Asali
Kashi 100% na asali ne, ana samar da su kai tsaye daga amintattun masana’antun kayan sarrafa masana’antu.
Jagorar Fasaha da Siyarwa
-
Brand-New PLC CPUs for Aging Coal Chemical Plants?
This technical article presents a data-driven upgrade strategy for aging GE Fanuc PLC CPUs in coal chemical facilitie...
-
Cross-Vendor PLC/DCS Integration for Auto MES?
This article presents field-validated MES docking methodologies for multi-vendor PLC and DCS environments in discrete...
-
AB PLC Dropping EIP Links with Bently 3500?
This field-validated guide addresses EtherNet/IP communication failures between Allen‑Bradley Logix PLCs and Bently N...
-
What is the best zero-downtime automation strategy for mega steelworks?
This article presents a hybrid multi-brand control system retrofit for large blast furnaces, integrating ABB DCS, GE ...
-
Cut Process Plant Retrofit CAPEX by 30% – How?
This field-validated audit framework addresses unplanned failures in process plant digital overhauls, where 72% of re...
-
Aging Ovation DCS Costing Millions?
This technical article examines quantified reliability risks of end-of-life Emerson Ovation DCS hardware in power gen...
