Canza gidanka da sabbin hanyoyin na’urorin lantarki masu yawa, daga hasken wuta mai hankali zuwa inganta ayyukanka da Bently Nevada 3500 Monitoring System, wanda ke ba da sa ido a ainihin lokaci kan girgiza da yanayin na’urorin injina don hana gazawa da ƙara lokacin aiki, da na’urorin da ake sarrafa su da murya duk an ƙera su ne don sauƙaƙa rayuwa, ƙara tsaro, da ƙarfafa haɗin kai.
SKU:22B-CCC
Allen-Bradley 22B-CCC PowerFlex 40 Frame C Adapter Cover
Manufacturer: Allen-Bradley
Product No.: 22B-CCC
Product Type: Adapter Cover
Product Origin: USA
Payment:T/T, Western Union
Weight: 160g
Shipping port: Xiamen
Warranty: 12 months
Raba
- Isarwa Cikin Gaggawa
- Tallafi na awa 24 a rana, kwana 7 a mako
- Tabbacin Inganci
Bayani
Product Overview
The Allen-Bradley 22B-CCC is a dedicated communication adapter front cover kit designed specifically for Frame Size C PowerFlex 40 Adjustable Frequency Drives. Weighing approximately 0.35 lbs (0.16 kg), this lightweight enclosure component is required when installing internal communication option cards—such as DeviceNet (22-COMM-D), ControlNet (22-COMM-C), or EtherNet/IP (22-COMM-E) adapters. The cover extends the overall drive depth by 25 mm while protecting internal card electronics and maintaining full exterior visibility of diagnostic status LEDs.
Key Advantages
- Dedicated Frame C Compatibility: Tailored exclusively to fit Frame C PowerFlex 40 drive housings for a clean, secure snap-on fit without modification.
- Diagnostic Light Visibility: Features clear window spacing so maintenance personnel can view LED status lights on the communication adapter at a glance.
- Lightweight & Compact Extension: Adds only 25 mm in additional depth and weighs 0.35 lbs (0.16 kg), avoiding significant enclosure footprint growth.
- IP20 Ingress Protection: Maintains the drive's IP20 touch-safe protection rating against solid foreign objects such as dust and tools.
Technical Specifications
| Model / Catalog Number | 22B-CCC |
| Manufacturer | Allen-Bradley / Rockwell Automation |
| Product Line | PowerFlex 40 Series |
| Target Drive Frame Size | Size C Frames |
| Component Weight | 0.35 lbs (approx. 0.16 kg) |
| Added Drive Depth | 25 mm (0.98 in) |
| Ingress Protection Rating | IP20 (Open-type enclosure) |
| Compatible Networks | DeviceNet, ControlNet, EtherNet/IP, BACnet, PROFIBUS |
Installation Guidelines
- Power Down Before Assembly: Ensure all main AC power supplied to the PowerFlex 40 drive is disconnected and bus capacitors are fully discharged before removing the factory front cover or installing communication options.
- Depth Allowance Check: Confirm panel door clearances accommodate the additional 25 mm (0.98 in) depth that the 22B-CCC adds to the front profile of the host drive.
- Card Alignment: Seat the 22-COMM option card onto the drive's DSI port ribbon header securely before snapping the 22B-CCC cover into place.
Frequently Asked Questions
Q1: Will the 22B-CCC fit on Frame B PowerFlex 40 drives?
A1: No. The 22B-CCC is sized specifically for Frame C drives. If you are using a Frame B PowerFlex 40 drive, you must use part number 22B-CCB instead.
Q2: Is the 22B-CCC cover required if I am NOT using a communication adapter card?
A2: No. The standard front cover included with the drive is sufficient for basic operation. The extended depth 22B-CCC cover is only necessary when a 22-COMM series communication card is installed to provide the required internal clearance.
Q3: Does this cover work with other communication cards besides DeviceNet?
A3: Yes. The 22B-CCC is compatible with various 22-COMM option cards used with PowerFlex 40 drives, including EtherNet/IP (22-COMM-E), ControlNet (22-COMM-C), BACnet (22-COMM-B), and PROFIBUS (22-COMM-P).
Ƙarin ƙayyadaddun bayanai
Sikeli (V/f)
Vector
mai amfani da wutar AC
Jagorar Sayi
- Tabbatar da ainihin samfurin, lambar ɓangare, da ƙayyadaddun bayanai kafin yin oda.
- Tabbatar da jituwa da injin ko tsarin kula da kake amfani da su a yanzu.
- Tuntuɓe mu ta sale@etowonauto.com ko +8617859788089 don taimakon fasaha.
- Duba zaɓuɓɓukan isarwa, lokacin jagora, da buƙatun jigilar kaya.
- Bi umarnin masana’anta da mafi kyawun hanyoyin aiki yayin girkawa.
Isarwa da Mayar da Kaya
Kayayyakin da ke cikin sito yawanci ana tura su a cikin wannan ranar aikin. Ga kayayyakin da ba sa cikin sito a yanzu, lokacin tura su na iya bambanta bisa ga samuwa. Ana ba da jigilar kaya zuwa ƙasashen waje, kuma ana ƙididdige kuɗin jigila bisa wurin da ake aikawa, nauyi, da kamfanin sufuri da aka zaɓa.
Ana karɓar mayar da kaya cikin kwanaki 30 bayan karɓa, muddin kayan ba a yi amfani da su ba kuma suna cikin yanayin da suka fito daga masana’anta. Kuɗin jigilar mayar da kaya nauyi ne a kan abokin ciniki. Da fatan za a tuntube mu kafin ku mayar da duk wani kaya domin samun izinin mayarwa.
Don ƙarin bayani, don Allah ku duba Manufar Jigila & Mayar da Kaya.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Isarwa cikin gaggawa
Sassan kayan otomeshan na masana’antu na ainihi suna nan a shirye don aikawa cikin gaggawa a ko’ina cikin duniya.
-
Mayar da kaya cikin sauƙi
Tallafin mayar da kaya na kwanaki 30 tare da garantin watanni 12 don tabbatacciyar kariya bayan saye.
-
Taimako a kowane lokaci (24/7)
Tallafin ƙwararru mai saurin amsawa don taimakawa kiyaye ayyuka cikin kwanciyar hankali da inganci.
-
Na Gaskiya & Asali
Kashi 100% na asali ne, ana samar da su kai tsaye daga amintattun masana’antun kayan sarrafa masana’antu.
Jagorar Fasaha da Siyarwa
-
Can Proper Warehousing Cut Automation Hardware Failures 80%?
This technical guide presents quantified storage and maintenance standards for industrial PLC, DCS, and TSI spare par...
-
Can Industrial Control Upgrades Cut Unplanned Downtime by 90%?
This article examines why legacy PLC, DCS, and vibration monitoring systems demand urgent retrofit in 2026. Citing re...
-
How to streamline industrial automation spare parts import clearance?
This guide delivers a data-driven framework for sourcing and clearing industrial automation spare parts, covering PLC...
-
How Fast Must DCS Switchover Be to Prevent Costly Process Upsets?
This article presents quantified DCS redundancy strategies using real 2024–2025 plant data. It details sub-100ms swit...
-
Why Is Explosion-Proof DCS Critical for Chemical Plant Safety?
This technical article examines how optimized multi-vendor explosion-proof DCS architectures address critical safety ...
-
How to restore Allen‑Bradley PLCs to 99.8% performance?
This technical article presents new, factory-original industrial automation hardware solutions for power plants and p...
