Uyingizni eng so‘nggi ko‘p funksiyali elektronika yechimlari bilan o‘zgartiring, aqlli yoritishdan tortib ovozli boshqariladigan qurilmalargacha — bularning barchasi hayotingizni osonroq, xavfsizroq va yanada bog‘langan qilish uchun mo‘ljallangan.
SKU:IC697ACC724
GE Fanuc IC697ACC724 Rack Cooling Fan 30 PPI Filter
Manufacturer: General Electric
Product No.: IC697ACC724
Product Type: Rack Fan Assembly
Product Origin: USA
Payment:T/T, Western Union
Weight: 1200g
Shipping port: Xiamen
Warranty: 12 months
Ulashish
- Tez yetkazib berish
- 24/7 Qo'llab-quvvatlash
- Sifat nazorati
Tavsif
Product Overview
The GE Fanuc IC697ACC724 is a professional-grade rack fan assembly designed for the Series 90-70 PLC systems. Engineered to provide consistent thermal management, this unit features three high-quality ball-bearing cooling fans that ensure the safe operation of your industrial electronics by maintaining a nominal airflow of 71 CFM.
This 240V AC assembly is built for durability, featuring rugged side-mount plates and a removable 30 PPI air filter to protect against dust and debris. With a weight of approximately 1.2 kg, the unit is easy to install and includes a 3-foot stripped lead on the leftmost fan for direct AC power integration.
Technical Specifications
| Parameter | Details |
|---|---|
| Manufacturer | GE Fanuc (Series 90-70) |
| Model Number | IC697ACC724 |
| Rated Voltage | 240 Volts AC |
| Input Power | 16–17 Watts |
| Air Flow | 71 CFM (Nominal) |
| Operating Temp | -28°C to +70°C |
Key Performance Features
- Efficient Dust Filtration: Includes a removable 30 PPI (pores per inch) filter that effectively traps industrial dust while maintaining optimal airflow resistance.
- Low Power Consumption: Consumes only 16–17 Watts during operation, providing an energy-efficient cooling solution for densely packed racks.
- Industrial Ball-Bearing Design: The triple-fan configuration utilizes ball bearings for extended service life and reduced vibration compared to standard sleeve-bearing alternatives.
- Secure Mounting: Equipped with robust side-mount plates designed to withstand the rigors of high-vibration industrial environments.
Installation & Electrical Safety
The IC697ACC724 is designed for high-voltage AC environments. The power connection is simplified via 3-foot leads located on the leftmost fan unit. Its operating temperature range of -28°C to +70°C makes it suitable for both cold-start conditions and high-heat factory floors. Regular inspection of the removable filter is recommended to ensure the nominal 71 CFM airflow is maintained.
Technical FAQs
Q1: What is the benefit of the ball-bearing fans in this model?
A1: Ball bearings allow for a wider operating temperature range and longer MTBF, particularly in vertical mounting orientations common in PLC racks.
Q2: Can I use this with 120V AC power?
A2: No, the IC697ACC724 is specifically rated for 240V AC. Applying 120V will result in insufficient cooling and potential fan failure.
Q3: How often should the air filter be cleaned?
A3: This depends on your environment, but in standard industrial settings, we recommend checking the 30 PPI filter every 3 to 6 months to prevent airflow restriction.
Condition: New & Original in Factory Packing
Warranty: 12 Months Factory Warranty
Qo'shimcha Texnik Tavsiflar
Skalyar (V/f)
Vektor
AC quvvatli
Sotib olish bo‘yicha qo‘llanma
- Buyurtma berishdan oldin aniq model, qism raqami va texnik xususiyatlarni tasdiqlang.
- Joriy mashinalaringiz yoki boshqaruv tizimlaringiz bilan mosligini ta’minlang.
- Texnik yordam uchun sale@etowonauto.com manzili yoki +8617859788089 raqamiga murojaat qiling.
- Yetkazib berish variantlari, yetkazib berish muddati va jo‘natish talablarini ko‘rib chiqing.
- O‘rnatish paytida ishlab chiqaruvchi ko‘rsatmalariga va eng yaxshi amaliyotlarga rioya qiling.
Yuborish va Qaytarish
Omborda mavjud bo‘lgan mahsulotlar odatda shu ish kuni jo‘natiladi. Hozirda omborda mavjud bo‘lmagan mahsulotlar uchun jo‘natish vaqti mavjudlikka qarab o‘zgarishi mumkin. Xalqaro yetkazib berish mavjud bo‘lib, yetkazib berish xarajatlari manzil, vazn va tashuvchi tanloviga ko‘ra hisoblanadi.
Qaytishlar qabul qilingan kundan boshlab 30 kun ichida amalga oshiriladi, agar mahsulotlar ishlatilmagan va asl holatda bo‘lsa. Qaytish xarajatlari mijoz zimmasida bo‘ladi. Iltimos, har qanday mahsulotni qaytarishdan oldin qaytish ruxsatini olish uchun biz bilan bog‘laning.
Batafsil ma’lumot uchun iltimos, Yetkazib berish va Qaytarish Siyosatini ko‘rib chiqing.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Tez yetkazib berish
Dunyoda tez yetkazib berish uchun original sanoat avtomatlashtirish qismlari mavjud.
-
Oson qaytarish
Ishonchli sotuvdan keyingi himoya uchun 12 oylik kafolat bilan 30 kunlik qaytarish qo'llab-quvvatlashi.
-
24/7 qo‘llab-quvvatlash
Barqaror va samarali ish faoliyatini ta'minlash uchun javobgar professional yordam.
-
Haqiqiy va Asl
100% haqiqiy, ishonchli sanoat avtomatlashtirish ishlab chiqaruvchilaridan to‘g‘ridan-to‘g‘ri olingan.
Texnik va Xarid Qollanmasi
-
Why does PLC signal interference cause 61% of shutdowns?
Heavy-duty lines have 3.2x more control faults than assembly lines due to EMI and load shocks. Standard PLCs cannot a...
-
What Is the Verified ROI of Cloud Automation?
Global manufacturers face scattered sites and limited maintenance staff. This article presents verified field data fr...
-
Sizning Kichik va O‘rta Biznes Jarayonlaringiz Zavodi Sanoat Avtomatizatsiyasi uchun Ortikcha To‘layaptimi?
Ushbu maqola kichik va o‘rta korxonalar jarayon fabrikalari uchun ortiqcha xarajat qilmasdan to‘g‘ri o‘lchamdagi DCS ...
-
Nima uchun CPU zaxirasi bo‘lishiga qaramay, 420 000 dollarlik to‘xtash yuz berdi?
Ushbu maqola 15 yillik maydonda sinovdan o'tgan dalillarni taqdim etadi, ular qisman DCS zaxirasi mavjud bo‘lsa ham, ...
-
How Does Emerson Edge Control Cut Cloud Dependency by 60%?
Emerson Edge Control Terminal processes OT data on-site, reducing latency to under 20ms and filtering 60% redundant d...
-
Low-Cost Brownfield Automation: Zero Downtime Possible?
This article shows how brownfield plants modernize legacy PLC and DCS systems using protocol gateways and edge termin...
