Uyingizni eng so‘nggi ko‘p funksiyali elektronika yechimlari bilan o‘zgartiring, aqlli yoritishdan tortib ovozli boshqariladigan qurilmalargacha — bularning barchasi hayotingizni osonroq, xavfsizroq va yanada bog‘langan qilish uchun mo‘ljallangan.
SKU:IC693CPU370
GE Fanuc IC693CPU370 CPU Module 133MHz 240KB 32-bit
Manufacturer: General Electric
Product No.: IC693CPU370
Product Type: CPU Module
Product Origin: USA
Payment:T/T, Western Union
Weight: 500g
Shipping port: Xiamen
Warranty: 12 months
Ulashish
- Tez yetkazib berish
- 24/7 Qo'llab-quvvatlash
- Sifat nazorati
Tavsif
GE Fanuc IC693CPU370 Series 90-30 CPU Module
The GE Fanuc IC693CPU370 is a 32-bit PLC CPU module for the Series 90-30 system. Powered by an 80386EX processor (AMD SC520) running at 133 MHz, this module delivers 240 KB of register memory and supports floating point math. It handles up to 4096 total I/O points, including 2048 analog I/O. Weighing approximately 0.5 kg (1.10 lbs), it consumes 7.4 W at 5 V DC.
Technical Specifications
| Parameter | Value |
|---|---|
| Manufacturer | GE Fanuc |
| Series | Series 90-30 |
| Part Number | IC693CPU370 |
| System Type | 32-bit PLC CPU |
| Processor Model | 80386EX (AMD SC520) |
| Processor Speed | 133 MHz |
| Register Memory | 240 KB |
| Maximum Total I/O | 4096 points |
| Analog I/O Capacity | 2048 points |
| Floating Point Math | Supported |
| Timers & Counters | 2000 units |
| Internal Coils | 3096 bits |
| Temporary Coils | 256 bits |
| System Registers | 28 words |
| Power Consumption | 7.4 W @ 5 V DC |
| Battery-Backed Clock | Included |
| Backup Battery Operation | 30+ days data retention |
| Weight | Approx. 0.5 kg (1.10 lbs) |
Model Number Breakdown
- IC693 – GE Fanuc Series 90-30 PLC Compatible
- CPU – Central Processing Unit
- 370 – 133 MHz, 240 KB, 80386EX Variant
Communication & Compatibility
- Serial Ports: None on CPU (RS-485 available via power supply)
- Ethernet Communication: Requires external Ethernet module
- EZ Program Store Device: Requires Ethernet connection
- Handheld Programmer: Not supported
Installation & Field Application Guide
- Install the CPU module in slot 0 of the Series 90-30 rack. Ensure the backplane power supply provides 7.4 W minimum.
- Connect RS-485 serial communication via the power supply connector for programming or HMI connection.
- For Ethernet connectivity, install an external Ethernet module (e.g., IC693CMM321) in an adjacent slot.
- Configure the CPU using GE Fanuc programming software. Set memory allocation, scan timing, and I/O mapping.
Why Choose the IC693CPU370
- 133 MHz 80386EX processor delivers high-speed logic execution.
- 240 KB register memory supports large control programs.
- Supports up to 4096 total I/O and 2048 analog I/O points.
- Battery-backed clock and 30+ day data retention ensure reliable operation.
Field Engineer FAQs
Q1: What is the scan time of the IC693CPU370?
A1: The typical scan time is 0.4 ms per 1K of logic, depending on program complexity and I/O configuration.
Q2: Can this CPU connect to an HMI without an Ethernet module?
A2: Yes, via the RS-485 port available through the power supply using GE Fanuc SNP or Modbus RTU protocols.
Q3: What type of battery is used for the clock and data retention?
A3: The IC693CPU370 uses a 3V lithium coin cell (replaceable) that provides over 30 days of data retention without external power.
Inquiries: sale@etowonauto.com
Qo'shimcha Texnik Tavsiflar
Skalyar (V/f)
Vektor
AC quvvatli
Sotib olish bo‘yicha qo‘llanma
- Buyurtma berishdan oldin aniq model, qism raqami va texnik xususiyatlarni tasdiqlang.
- Joriy mashinalaringiz yoki boshqaruv tizimlaringiz bilan mosligini ta’minlang.
- Texnik yordam uchun sale@etowonauto.com manzili yoki +8617859788089 raqamiga murojaat qiling.
- Yetkazib berish variantlari, yetkazib berish muddati va jo‘natish talablarini ko‘rib chiqing.
- O‘rnatish paytida ishlab chiqaruvchi ko‘rsatmalariga va eng yaxshi amaliyotlarga rioya qiling.
Yuborish va Qaytarish
Omborda mavjud bo‘lgan mahsulotlar odatda shu ish kuni jo‘natiladi. Hozirda omborda mavjud bo‘lmagan mahsulotlar uchun jo‘natish vaqti mavjudlikka qarab o‘zgarishi mumkin. Xalqaro yetkazib berish mavjud bo‘lib, yetkazib berish xarajatlari manzil, vazn va tashuvchi tanloviga ko‘ra hisoblanadi.
Qaytishlar qabul qilingan kundan boshlab 30 kun ichida amalga oshiriladi, agar mahsulotlar ishlatilmagan va asl holatda bo‘lsa. Qaytish xarajatlari mijoz zimmasida bo‘ladi. Iltimos, har qanday mahsulotni qaytarishdan oldin qaytish ruxsatini olish uchun biz bilan bog‘laning.
Batafsil ma’lumot uchun iltimos, Yetkazib berish va Qaytarish Siyosatini ko‘rib chiqing.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Tez yetkazib berish
Dunyoda tez yetkazib berish uchun original sanoat avtomatlashtirish qismlari mavjud.
-
Oson qaytarish
Ishonchli sotuvdan keyingi himoya uchun 12 oylik kafolat bilan 30 kunlik qaytarish qo'llab-quvvatlashi.
-
24/7 qo‘llab-quvvatlash
Barqaror va samarali ish faoliyatini ta'minlash uchun javobgar professional yordam.
-
Haqiqiy va Asl
100% haqiqiy, ishonchli sanoat avtomatlashtirish ishlab chiqaruvchilaridan to‘g‘ridan-to‘g‘ri olingan.
Texnik va Xarid Qollanmasi
-
What Are the Hidden Costs of Fake PLC and DCS Modules?
This guide presents data-driven verification protocols for imported industrial control spare parts, addressing the es...
-
Redundant PLC + DCS: 18.6% Fan Energy Savings?
This case study documents a full automation retrofit for a 300 TPD waste incineration plant. By integrating Emerson D...
-
Can Proper Warehousing Cut Automation Hardware Failures 80%?
This technical guide presents quantified storage and maintenance standards for industrial PLC, DCS, and TSI spare par...
-
Can Industrial Control Upgrades Cut Unplanned Downtime by 90%?
This article examines why legacy PLC, DCS, and vibration monitoring systems demand urgent retrofit in 2026. Citing re...
-
How to streamline industrial automation spare parts import clearance?
This guide delivers a data-driven framework for sourcing and clearing industrial automation spare parts, covering PLC...
-
How Fast Must DCS Switchover Be to Prevent Costly Process Upsets?
This article presents quantified DCS redundancy strategies using real 2024–2025 plant data. It details sub-100ms swit...
