Canza gidanka da sabbin hanyoyin na’urorin lantarki masu yawa, daga hasken wuta mai hankali zuwa inganta ayyukanka da Bently Nevada 3500 Monitoring System, wanda ke ba da sa ido a ainihin lokaci kan girgiza da yanayin na’urorin injina don hana gazawa da ƙara lokacin aiki, da na’urorin da ake sarrafa su da murya duk an ƙera su ne don sauƙaƙa rayuwa, ƙara tsaro, da ƙarfafa haɗin kai.
SKU:IS200TREGH1BDB
IS200TREGH1BDB General Electric Solenoid Trip Module
Manufacturer: General Electric
Product No.: IS200TREGH1BDB
Product Type: Terminal Board
Product Origin: USA
Payment:T/T, Western Union
Weight: 910g
Shipping port: Xiamen
Warranty: 12 months
Raba
- Isarwa Cikin Gaggawa
- Tallafi na awa 24 a rana, kwana 7 a mako
- Tabbacin Inganci
Bayani
Product Overview
The GE IS200TREGH1BDB is a Turbine Emergency Trip Terminal Board (TREG) designed for GE Speedtronic Mark VI gas and steam turbine control systems. Manufactured in Salem, Virginia, USA, this board controls the positive side of DC power supplied to up to three primary trip solenoids, integrating advanced relay voting logic, emergency stop, and primary/emergency overspeed protection mechanisms.
Core Features
- Triple Redundant Relay Voting: Houses 12 onboard relays, including 9 relays organized into a 2-out-of-3 voting structure for fail-safe solenoid trip actuation.
- DC Power Distribution: Manages positive DC power output to 3 trip solenoids in coordination with the complementary TRPG terminal board (which supplies negative DC power).
- Simplex Servo Clamp Support: Features J1 cable routing to the TSVO board for automatic servo valve clamping post-turbine trip.
- Integrated Test Feedback: Supports online sequential solenoid testing and offline overspeed simulation with real-time contact feedback.
Technical Specifications
| Parameter | Data |
|---|---|
| Part Number | IS200TREGH1BDB |
| System Series | Mark VI Speedtronic Turbine Control System |
| Board Dimensions | 7.0 in x 13.0 in (17.8 cm x 33.0 cm) |
| Coating & Revision | Conformal Coating (H1 Group 1) / Revision BDB |
| Trip Interlock Filter | 4 ms hardware filter |
| Relay Count | 12 relays total (9 voting relays + 3 system control relays) |
| Terminal Blocks | 2 solid black blocks with 24 terminals each (48 points total) |
| Operating Temperature | 0°C to +60°C (32°F to 140°F) |
| Module Net Weight | 0.91 kg (2.0 lbs) |
| Country of Origin | United States of America (USA) |
Engineering & Installation Guide
- Wiring Pair Setup: Connect positive DC lines from the IS200TREGH1BDB terminal blocks directly to the trip solenoids while ensuring negative legs connect to the TRPG terminal board.
- Simplex Cable Routing: In simplex control configurations, route the dedicated J1 cable to the TSVO terminal board to enable the post-trip servo valve clamping function.
- Terminal Torque: Secure wiring into the 48 silver metallic screw terminals to prevent high-vibration contact resistance on critical trip signal lines.
- Environmental Protection: Ensure panel ambient temperatures stay within 0°C to 60°C; the H1 conformal coating shields components from atmospheric contaminants and moisture.
Technical FAQs
Q1: What does IS200TREGH1BDB do?
A1: Controls positive DC power to 3 emergency trip solenoids with voting logic.
Q2: How to test solenoids online?
A2: Tripped individually via PTR/ETR relays with circuit contact feedback.
Q3: What role does TRPG board play with TREG?
A3: TRPG supplies negative DC power while TREG handles positive DC power.
Ƙarin ƙayyadaddun bayanai
- Kore
Sikeli (V/f)
Vector
mai amfani da wutar AC
Jagorar Sayi
- Tabbatar da ainihin samfurin, lambar ɓangare, da ƙayyadaddun bayanai kafin yin oda.
- Tabbatar da jituwa da injin ko tsarin kula da kake amfani da su a yanzu.
- Tuntuɓe mu ta sale@etowonauto.com ko +8617859788089 don taimakon fasaha.
- Duba zaɓuɓɓukan isarwa, lokacin jagora, da buƙatun jigilar kaya.
- Bi umarnin masana’anta da mafi kyawun hanyoyin aiki yayin girkawa.
Isarwa da Mayar da Kaya
Kayayyakin da ke cikin sito yawanci ana tura su a cikin wannan ranar aikin. Ga kayayyakin da ba sa cikin sito a yanzu, lokacin tura su na iya bambanta bisa ga samuwa. Ana ba da jigilar kaya zuwa ƙasashen waje, kuma ana ƙididdige kuɗin jigila bisa wurin da ake aikawa, nauyi, da kamfanin sufuri da aka zaɓa.
Ana karɓar mayar da kaya cikin kwanaki 30 bayan karɓa, muddin kayan ba a yi amfani da su ba kuma suna cikin yanayin da suka fito daga masana’anta. Kuɗin jigilar mayar da kaya nauyi ne a kan abokin ciniki. Da fatan za a tuntube mu kafin ku mayar da duk wani kaya domin samun izinin mayarwa.
Don ƙarin bayani, don Allah ku duba Manufar Jigila & Mayar da Kaya.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Isarwa cikin gaggawa
Sassan kayan otomeshan na masana’antu na ainihi suna nan a shirye don aikawa cikin gaggawa a ko’ina cikin duniya.
-
Mayar da kaya cikin sauƙi
Tallafin mayar da kaya na kwanaki 30 tare da garantin watanni 12 don tabbatacciyar kariya bayan saye.
-
Taimako a kowane lokaci (24/7)
Tallafin ƙwararru mai saurin amsawa don taimakawa kiyaye ayyuka cikin kwanciyar hankali da inganci.
-
Na Gaskiya & Asali
Kashi 100% na asali ne, ana samar da su kai tsaye daga amintattun masana’antun kayan sarrafa masana’antu.
Jagorar Fasaha da Siyarwa
-
Can Emerson DeltaV DCS Cards Optimize Chemical Safety Loops?
This technical article examines how Emerson DeltaV DCS card upgrades address legacy control limitations in chemical p...
-
Is Partial CNC Board Replacement Better Than a Full System Upgrade?
This technical article examines the dominance of GE Fanuc CNC hardware in heavy-duty automation, supported by field d...
-
Can Genuine PLC Modules Cut DCS Downtime 60%?
This article examines how genuine Allen-Bradley PLC module replacement strategies directly reduce unplanned DCS downt...
-
Is Your GE Fanuc PLC Talking to ABB DCS?
This article reveals how cross-system data silos between GE Fanuc PLC and ABB DCS cause 8–15% production losses in pr...
-
Can Integrated PLC-DCS-TSI Fix Data Silos?
Most industrial digital twins remain static visualization tools because discrete control, process automation, and con...
-
How to Cut Power Plant Outages with ABB and GE Fanuc Retrofits?
This technical article outlines a data-driven approach to modernizing power plant control systems using a hybrid ABB ...
