Canza gidanka da sabbin hanyoyin na’urorin lantarki masu yawa, daga hasken wuta mai hankali zuwa inganta ayyukanka da Bently Nevada 3500 Monitoring System, wanda ke ba da sa ido a ainihin lokaci kan girgiza da yanayin na’urorin injina don hana gazawa da ƙara lokacin aiki, da na’urorin da ake sarrafa su da murya duk an ƙera su ne don sauƙaƙa rayuwa, ƙara tsaro, da ƙarfafa haɗin kai.
SKU:IS200ERIOH1A
GE IS200ERIOH1A Exciter Regulator I/O Board Mark VI
Manufacturer: General Electric
Product No.: IS200ERIOH1A
Product Type: I/O Board
Product Origin: USA
Payment:T/T, Western Union
Weight: 450g
Shipping port: Xiamen
Warranty: 12 months
Raba
- Isarwa Cikin Gaggawa
- Tallafi na awa 24 a rana, kwana 7 a mako
- Tabbacin Inganci
Bayani
Product Overview
The GE IS200ERIOH1A is an Exciter Regulator I/O board for the EX2100 system and Mark VI series. It provides system and customer I/O for both simplex and redundant regulator control applications. The board features a double‑wide faceplate with toggle switch, two backplane connectors (P1/P2), dual CPU sockets, and an FPGA for data acquisition into DPM. Weight: 0.45 kg.
Core Advantages
Flexible Redundancy Support
Supports simplex (single board in ERBP) and redundant (three boards in ERRB M1/M2/C) configurations. Adapts to your system's availability requirements.
Comprehensive I/O Interface
Interfaces with ECTBG2/EPCT terminal boards for customer I/O, and EROC/ERDD for system I/O. In redundant systems, also interfaces with ERRR relay board.
FPGA Data Management
Field‑Programmable Gate Array controls data acquisition and storage into Dual Port Memory (DPM) for fast, deterministic I/O handling.
Specifications
| Parameter | Value |
|---|---|
| Part Number | IS200ERIOH1A |
| Manufacturer | General Electric |
| Series | Mark VI |
| System | EX2100 Excitation Regulator |
| Function | System & Customer I/O Interface |
| Redundancy Support | Simplex (1x) / Redundant (3x) |
| Mounting (Simplex) | ERBP |
| Mounting (Redundant) | ERRB M1, M2, C |
| Faceplate Width | Double‑wide |
| Toggle Switch | 1 included |
| Backplane Connectors | P1 / P2 |
| CPU Sockets | 2 |
| FPGA | Yes (DPM data acquisition) |
| Customer I/O Interface | ECTBG2, EPCT (via 25‑pin) |
| System I/O Interface | EROC, ERDD, ERRR (redundant) |
| Revision | "A" (later revision) |
| Weight | 0.45 kg |
Installation Tips
Simplex Configuration
Mount the IS200ERIOH1A in the ERBP backplane. It interfaces customer I/O via ECTBG2 and EPCT terminal boards through two 25‑pin connectors.
Redundant Configuration
Install three boards in ERRB backplane at M1, M2, and C positions. All three controllers share the same PCB for coordinated redundant operation.
FPGA & DPM
The FPGA handles data acquisition and storage into DPM. Ensure firmware is compatible with your EX2100 system version.
Why Choose IS200ERIOH1A?
Delivers versatile I/O interfacing for GE EX2100 excitation systems. Supports both simplex and triple‑redundant configurations. The FPGA‑based data acquisition ensures fast, deterministic I/O handling. Double‑wide faceplate with toggle switch provides easy manual control. Built to GE's Mark VI quality standards, this board is essential for turbine excitation regulation.
FAQs
Q1: What does the "A" revision indicate?
A1: The "A" denotes a later revision of the original part, typically including enhancements or component updates.
Q2: How many boards are needed for redundant systems?
A2: Three boards are required, mounted at ERRB positions M1, M2, and C for full TMR redundancy.
Q3: What does the toggle switch on the faceplate do?
A3: The toggle switch provides manual control access. Its specific function depends on system configuration — refer to your EX2100 manual.
Ƙarin ƙayyadaddun bayanai
- Kore
Sikeli (V/f)
Vector
mai amfani da wutar AC
Jagorar Sayi
- Tabbatar da ainihin samfurin, lambar ɓangare, da ƙayyadaddun bayanai kafin yin oda.
- Tabbatar da jituwa da injin ko tsarin kula da kake amfani da su a yanzu.
- Tuntuɓe mu ta sale@etowonauto.com ko +8617859788089 don taimakon fasaha.
- Duba zaɓuɓɓukan isarwa, lokacin jagora, da buƙatun jigilar kaya.
- Bi umarnin masana’anta da mafi kyawun hanyoyin aiki yayin girkawa.
Isarwa da Mayar da Kaya
Kayayyakin da ke cikin sito yawanci ana tura su a cikin wannan ranar aikin. Ga kayayyakin da ba sa cikin sito a yanzu, lokacin tura su na iya bambanta bisa ga samuwa. Ana ba da jigilar kaya zuwa ƙasashen waje, kuma ana ƙididdige kuɗin jigila bisa wurin da ake aikawa, nauyi, da kamfanin sufuri da aka zaɓa.
Ana karɓar mayar da kaya cikin kwanaki 30 bayan karɓa, muddin kayan ba a yi amfani da su ba kuma suna cikin yanayin da suka fito daga masana’anta. Kuɗin jigilar mayar da kaya nauyi ne a kan abokin ciniki. Da fatan za a tuntube mu kafin ku mayar da duk wani kaya domin samun izinin mayarwa.
Don ƙarin bayani, don Allah ku duba Manufar Jigila & Mayar da Kaya.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Isarwa cikin gaggawa
Sassan kayan otomeshan na masana’antu na ainihi suna nan a shirye don aikawa cikin gaggawa a ko’ina cikin duniya.
-
Mayar da kaya cikin sauƙi
Tallafin mayar da kaya na kwanaki 30 tare da garantin watanni 12 don tabbatacciyar kariya bayan saye.
-
Taimako a kowane lokaci (24/7)
Tallafin ƙwararru mai saurin amsawa don taimakawa kiyaye ayyuka cikin kwanciyar hankali da inganci.
-
Na Gaskiya & Asali
Kashi 100% na asali ne, ana samar da su kai tsaye daga amintattun masana’antun kayan sarrafa masana’antu.
Jagorar Fasaha da Siyarwa
-
Can Emerson DeltaV DCS Cards Optimize Chemical Safety Loops?
This technical article examines how Emerson DeltaV DCS card upgrades address legacy control limitations in chemical p...
-
Is Partial CNC Board Replacement Better Than a Full System Upgrade?
This technical article examines the dominance of GE Fanuc CNC hardware in heavy-duty automation, supported by field d...
-
Can Genuine PLC Modules Cut DCS Downtime 60%?
This article examines how genuine Allen-Bradley PLC module replacement strategies directly reduce unplanned DCS downt...
-
Is Your GE Fanuc PLC Talking to ABB DCS?
This article reveals how cross-system data silos between GE Fanuc PLC and ABB DCS cause 8–15% production losses in pr...
-
Can Integrated PLC-DCS-TSI Fix Data Silos?
Most industrial digital twins remain static visualization tools because discrete control, process automation, and con...
-
How to Cut Power Plant Outages with ABB and GE Fanuc Retrofits?
This technical article outlines a data-driven approach to modernizing power plant control systems using a hybrid ABB ...