Canza gidanka da sabbin hanyoyin na’urorin lantarki masu yawa, daga hasken wuta mai hankali zuwa inganta ayyukanka da Bently Nevada 3500 Monitoring System, wanda ke ba da sa ido a ainihin lokaci kan girgiza da yanayin na’urorin injina don hana gazawa da ƙara lokacin aiki, da na’urorin da ake sarrafa su da murya duk an ƙera su ne don sauƙaƙa rayuwa, ƙara tsaro, da ƙarfafa haɗin kai.
SKU:IC695STK010
GE IC695STK010 RX3i Profinet Starter Kit PLC Module Rack
Manufacturer: General Electric
Product No.: IC695STK010
Product Type: I/O Rack
Product Origin: USA
Payment:T/T, Western Union
Weight: 9070g
Shipping port: Xiamen
Warranty: 12 months
Raba
- Isarwa Cikin Gaggawa
- Tallafi na awa 24 a rana, kwana 7 a mako
- Tabbacin Inganci
Bayani
IC695STK010 GE RX3i Profinet Starter Kit – CPE305 + 7 Slot Base
The GE IC695STK010 is an RX3i Profinet Starter Kit. Includes CPE305 CPU, 7 slot universal backplane, AC power supply, and input/output modules. Complete solution for Profinet-based automation projects.
Product Information
| Part Number | IC695STK010 |
| Product Type | RX3i Profinet Starter Kit |
| Manufacturer | General Electric |
| Series | PACSystem RX3i |
| Category | PLCs / Machine Control |
| Subcategory | PLC Module / Rack |
| Weight | 20.00 lbs (9.07 kg) |
Kit Contents
| CPU | CPE305 |
| Backplane | 7 Slot Universal Base |
| Power Supply | AC Power Supply |
| IO Modules | Input and Output Modules Included |
Features
- Complete Profinet starter kit for RX3i platform
- CPE305 CPU with Profinet connectivity
- 7 slot universal backplane for module expansion
- AC power supply included
- Input and output modules for immediate testing
- Ideal for process control and factory automation
FAQs
Q1: What is included in the IC695STK010 kit?
A1: CPE305 CPU, 7 slot universal base, AC power supply, and input/output modules.
Q2: What is the weight of the kit?
A2: 20.00 lbs (9.07 kg).
Q3: What is the primary use of this starter kit?
A3: To build, test, and deploy Profinet-based automation systems using the RX3i platform.
Ƙarin ƙayyadaddun bayanai
Sikeli (V/f)
Vector
mai amfani da wutar AC
Jagorar Sayi
- Tabbatar da ainihin samfurin, lambar ɓangare, da ƙayyadaddun bayanai kafin yin oda.
- Tabbatar da jituwa da injin ko tsarin kula da kake amfani da su a yanzu.
- Tuntuɓe mu ta sale@etowonauto.com ko +8617859788089 don taimakon fasaha.
- Duba zaɓuɓɓukan isarwa, lokacin jagora, da buƙatun jigilar kaya.
- Bi umarnin masana’anta da mafi kyawun hanyoyin aiki yayin girkawa.
Isarwa da Mayar da Kaya
Kayayyakin da ke cikin sito yawanci ana tura su a cikin wannan ranar aikin. Ga kayayyakin da ba sa cikin sito a yanzu, lokacin tura su na iya bambanta bisa ga samuwa. Ana ba da jigilar kaya zuwa ƙasashen waje, kuma ana ƙididdige kuɗin jigila bisa wurin da ake aikawa, nauyi, da kamfanin sufuri da aka zaɓa.
Ana karɓar mayar da kaya cikin kwanaki 30 bayan karɓa, muddin kayan ba a yi amfani da su ba kuma suna cikin yanayin da suka fito daga masana’anta. Kuɗin jigilar mayar da kaya nauyi ne a kan abokin ciniki. Da fatan za a tuntube mu kafin ku mayar da duk wani kaya domin samun izinin mayarwa.
Don ƙarin bayani, don Allah ku duba Manufar Jigila & Mayar da Kaya.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Isarwa cikin gaggawa
Sassan kayan otomeshan na masana’antu na ainihi suna nan a shirye don aikawa cikin gaggawa a ko’ina cikin duniya.
-
Mayar da kaya cikin sauƙi
Tallafin mayar da kaya na kwanaki 30 tare da garantin watanni 12 don tabbatacciyar kariya bayan saye.
-
Taimako a kowane lokaci (24/7)
Tallafin ƙwararru mai saurin amsawa don taimakawa kiyaye ayyuka cikin kwanciyar hankali da inganci.
-
Na Gaskiya & Asali
Kashi 100% na asali ne, ana samar da su kai tsaye daga amintattun masana’antun kayan sarrafa masana’antu.
Jagorar Fasaha da Siyarwa
-
Stop 68% of DCS Faults with Proven Transmitter Matching Rules?
This article presents field-verified solutions for optimizing communication between Rosemount transmitters and Emerso...
-
What Does Poor PLC Backup Cost Your Paper Plant?
This technical article presents quantified backup and recovery standards for GE Fanuc RX7i PLCs in high-capacity pape...
-
Why Do 42% of Offshore DCS Downtime Events Trace to Power Modules?
This technical analysis examines the root causes of Allen‑Bradley power module failures in offshore control cabi...
-
Can Layered PLC Fix Chemical Batch Failures?
This technical article presents field-validated ABB AC800M configuration strategies for high-stability fine chemical ...
-
How to Select GE Fanuc 90-30 Spare Parts for Hot Rolling Mills?
This article provides a technical guide for selecting and managing GE Fanuc Series 90-30 PLC spare parts in meta...
-
How Does Bently Nevada 3500 Reduce Unplanned Turbine Trips?
This technical article analyzes the quantitative value of the Bently Nevada 3500 TSI system in thermal power shaft pr...
