Trasforma la tua casa con le ultime soluzioni multi-elettroniche, dall'illuminazione intelligente ai dispositivi controllati tramite voce, tutti progettati per rendere la vita più facile, sicura e connessa. Ottimizza le tue operazioni con il Sistema di Monitoraggio Bently Nevada 3500, che offre il monitoraggio in tempo reale delle vibrazioni e delle condizioni delle macchine per prevenire guasti e massimizzare il tempo di attività.
SKU:IC693CBL302
15 Meter Terminated Cable IC693CBL302 GE Fanuc 90-30 PLC
Manufacturer: General Electric
Product No.: IC693CBL302
Product Type: Expansion Cable
Product Origin: USA
Payment:T/T, Western Union
Weight: 1700g
Shipping port: Xiamen
Warranty: 12 months
Condividi
- Consegna Veloce
- Assistenza 24 ore su 24, 7 giorni su 7
- Assicurazione della qualità
Descrizione
Technical Specifications
| Part Number | IC693CBL302 |
| Product Type | I/O Bus Expansion Cable (Terminated) |
| Brand / Manufacturer | GE Fanuc / Emerson |
| Product Series | Series 90-30 PLC |
| Cable Length | 15 meters (49.21 feet) |
| Cable Structure | Continuous shielded design for high signal integrity |
| First End Connector | Single Male Connector (plugs into CPU/Previous baseplate) |
| Second End Connector | Single Male Terminated Connector with Integrated Resistors |
| Built-in Termination | Yes (Eliminates need for separate external terminator plug) |
| Wye Adapter Compatibility | Not compatible (Designed strictly as end-of-line cable) |
| Max Cumulative Cable Length | 213 meters (700 feet) from CPU to the last baseplate |
| Supported Baseplates | CPU 350 to 374: Up to 7 expansion backplanes CPU 331 to 341: Up to 4 expansion backplanes |
| Recommended Replacement | 1-Year preventative maintenance interval |
| Net Product Weight | 1.70 kg (Approx. 3.75 lbs) |
Product Overview
The GE Fanuc IC693CBL302 is a 15-meter (49.21 feet) continuous shielded I/O Bus Expansion Cable designed specifically for the Series 90-30 PLC platform. Weighing approximately 1.70 kg (3.75 lbs), this heavy-duty cable is engineered exclusively to close out the last position in an I/O expansion or remote baseplate chain. By integrating terminating resistors directly inside its end connector, it completes the bus loop without requiring a standalone physical terminator plug (like the IC693ACC307) or any external Wye adapters.
Core Technical Advantages
- End-of-Line Signal Termination: Comes equipped with built-in terminating resistors inside the final male connector, eliminating signal reflection and stabilizing bus communication.
- Robust Shielded Construction: Features a continuous, high-grade shield configuration that blocks industrial electromagnetic interference (EMI) over its long 15-meter run.
- No Adapter Complexity: Direct point-to-point architecture removes the need for Wye adapters, lowering the footprint and reducing connection failure points in high-vibration panels.
- Substantial Physical Integrity: The robust 1.70 kg build provides the physical durability required to route through harsh cable trays and complex routing paths in industrial automation settings.
Installation Guide
Before installing, shut off the power to the Series 90-30 PLC rack system. Plug the first end (standard single male connector) into the I/O expansion port of your CPU baseplate or the output port of the preceding expansion baseplate in the daisy chain. Connect the second end (the connector containing the integrated resistors) into the final expansion baseplate of the system. Secure the connector mounting screws to prevent loose communication signals. Ensure the total cumulative cable run from the host CPU to the final 1.70 kg expansion cable terminal does not exceed the system maximum of 213 meters (700 feet).
Technical FAQs
Q1: Can I connect another expansion cable to the end of the IC693CBL302?
A1: No. The IC693CBL302 is designed strictly for the final baseplate in the chain. Because the terminating resistors are built directly into the second-end connector, it terminates the I/O bus and cannot be used to daisy-chain further.
Q2: Why is the maximum number of supported expansion baseplates different?
A2: The maximum number of supported expansion racks is restricted by the addressing capabilities of the system's CPU. High-performance models (such as CPU 350 to 374) support up to 7 cables/racks, while entry-level models (CPU 331 to 341) support up to 4 racks.
Q3: How much does this 15-meter cable weigh, and does it require special support?
A3: The net weight of this heavy-duty cable is 1.70 kg (3.75 lbs). Due to its weight and length, it is highly recommended to secure the cable along structural conduit trays to relieve physical strain on the PLC baseplate connector pins.
Specifiche aggiuntive
Scalare (V/f)
Vettore
Alimentato a corrente alternata
Guida all'acquisto
- Conferma il modello esatto, il numero di parte e le specifiche prima di ordinare.
- Verifica la compatibilità con la tua macchina o i sistemi di controllo attuali.
- Contatta sale@etowonauto.com o +8617859788089 per assistenza tecnica.
- Esamina le opzioni di consegna, i tempi di attesa e i requisiti di spedizione.
- Segui le istruzioni del produttore e le migliori pratiche durante l’installazione.
Spedizione e Resi
Gli articoli disponibili in magazzino vengono solitamente spediti lo stesso giorno lavorativo. Per i prodotti non attualmente disponibili, i tempi di spedizione possono variare in base alla disponibilità. La spedizione internazionale è disponibile e i costi di spedizione sono calcolati in base alla destinazione, al peso e al corriere scelto.
Le restituzioni sono accettate entro 30 giorni dal ricevimento, a condizione che gli articoli siano inutilizzati e nelle condizioni originali. Le spese di spedizione per la restituzione sono a carico del cliente. Si prega di contattarci prima di restituire qualsiasi articolo per ricevere l'autorizzazione al reso.
Per maggiori dettagli, si prega di consultare la nostra Politica di Spedizione e Reso.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Spedizione Veloce
Ricambi originali per automazione industriale disponibili per spedizione rapida in tutto il mondo.
-
Resi Facili
Supporto per resi entro 30 giorni con garanzia di 12 mesi per una protezione post-vendita affidabile.
-
Supporto 24/7
Supporto professionale reattivo per aiutare a mantenere operazioni stabili ed efficienti.
-
Autentico e Originale
100% autentico, proveniente direttamente da produttori affidabili di automazione industriale.
Guida tecnica e all'acquisto
-
Hybrid DCS/PLC: Digital Twin Fix?
This technical article examines how hybrid ABB DCS and Allen‑Bradley PLC architectures overcome data isolation and co...
-
Why Do 68% of Turbine False Trips Come from TSI-DCS Signal Mismatch
This technical article examines the critical compatibility challenges between Bently Nevada 3300/3500 TSI probes and ...
-
Cutting Multi-Vendor Downtime by 32% – Is Your Plant Ready?
Emerson Boundless Automation unifies data from ABB DCS, Allen-Bradley PLC, and GE Fanuc controllers without gateways....
-
Can Hybrid PLC-TSI Replace Expensive DCS Systems?
Small and medium refineries face critical monitoring bottlenecks with manual inspections causing 8-hour fault detecti...
-
What is the Real Cost of Corrosion on Factory Automation?
Standard automation hardware fails rapidly in corrosive heavy industries, causing significant downtime and mainten...
-
Can DCS-PLC-TSI Synergy Cut Refinery Furnace Energy Loss by 7%?
This article explains how synchronizing Distributed Control Systems, Programmable Logic Controllers, and Turbine Supe...
