Canza gidanka da sabbin hanyoyin na’urorin lantarki masu yawa, daga hasken wuta mai hankali zuwa inganta ayyukanka da Bently Nevada 3500 Monitoring System, wanda ke ba da sa ido a ainihin lokaci kan girgiza da yanayin na’urorin injina don hana gazawa da ƙara lokacin aiki, da na’urorin da ake sarrafa su da murya duk an ƙera su ne don sauƙaƙa rayuwa, ƙara tsaro, da ƙarfafa haɗin kai.
SKU:IC755ACCBATTNL
IC755ACCBATTNL | Quickpanel Backup Battery 512KB SRAM GE
Manufacturer: General Electric
Product No.: IC755ACCBATTNL
Product Type: Battery Module
Product Origin: USA
Payment:T/T, Western Union
Weight: 1360g
Shipping port: Xiamen
Warranty: 12 months
Raba
- Isarwa Cikin Gaggawa
- Tallafi na awa 24 a rana, kwana 7 a mako
- Tabbacin Inganci
Bayani
Product Overview
The GE Fanuc IC755ACCBATTNL replacement battery pack provides backup power for 10-inch, 12-inch, and 15-inch Quickpanel+ industrial operator terminals. This lithium coin cell maintains the 512KB battery-backed SRAM, preserving critical configuration data during power interruptions. Use only this pack for battery replacement on these Quickpanel+ units.
Core Functionality
The IC755ACCBATTNL supplies continuous power to the SRAM when the terminal is disconnected from main power. This ensures retention of application programs, screen configurations, and historical data. The lithium coin cell offers long shelf life and stable voltage output. Replacement is required when the battery degrades from repeated charge/discharge cycles and can no longer sustain data retention for the appropriate duration.
Technical Specifications
| Parameter | Value |
| Part Number | IC755ACCBATTNL |
| Manufacturer | GE Fanuc / Emerson |
| Product Type | Replacement Battery Pack |
| Compatibility | 10", 12", 15" Quickpanel+ terminals |
| Battery Type | Lithium Coin Cell |
| Material | Lithium |
| Backed Memory | 512 KB SRAM |
| Weight | 1.36 kg (3.00 lbs) |
| Location | Back of Quickpanel terminal |
| Hazardous Installation | Not recommended |
Installation Guide
Perform replacement only in a non-hazardous location with trained personnel. Remove the 7 screws securing the back cover. Gently press on either side of the tab to release the cover, then lift it upward. Locate the coin cell battery and note its polarity. Remove the old battery and install the new one with correct orientation. Replace the back cover and tighten screws to secure. Dispose of faulty batteries per local and state regulations.
Safety Instructions
Lithium coin batteries present fire and explosion risks if mishandled. Do not crush, disassemble, short-circuit, or incinerate the battery. Store in a cool, dry location away from conductive materials. Replace only with the IC755ACCBATTNL pack – using alternative batteries may cause damage or data loss. Faulty batteries must be recycled through approved collection programs.
Engineering Advantages
This genuine GE Fanuc battery pack ensures reliable data retention for Quickpanel+ SRAM memory. The lithium coin cell delivers stable voltage over extended periods, minimizing the risk of configuration loss. The pack is specifically validated for 10, 12, and 15-inch terminals, eliminating compatibility concerns. The straightforward coin-cell design simplifies field replacement with basic tools and minimal downtime.
Technical FAQs
Q1: How do I know when the battery needs replacement?
A1: The Quickpanel+ displays a low-battery warning message. Data loss or configuration corruption upon power cycling also indicates the battery requires replacement.
Q2: Can I use a third-party battery instead of IC755ACCBATTNL?
A2: No. GE Fanuc specifies that only the IC755ACCBATTNL pack should be used. Third-party batteries may have incorrect voltage, polarity, or form factor causing damage.
Q3: Is the battery replacement hot-swappable?
A3: No. The terminal must be powered off and disconnected from main power before opening the back cover and replacing the battery.
Ƙarin ƙayyadaddun bayanai
- Goge
Sikeli (V/f)
Vector
mai amfani da wutar AC
Jagorar Sayi
- Tabbatar da ainihin samfurin, lambar ɓangare, da ƙayyadaddun bayanai kafin yin oda.
- Tabbatar da jituwa da injin ko tsarin kula da kake amfani da su a yanzu.
- Tuntuɓe mu ta sale@etowonauto.com ko +8617859788089 don taimakon fasaha.
- Duba zaɓuɓɓukan isarwa, lokacin jagora, da buƙatun jigilar kaya.
- Bi umarnin masana’anta da mafi kyawun hanyoyin aiki yayin girkawa.
Isarwa da Mayar da Kaya
Kayayyakin da ke cikin sito yawanci ana tura su a cikin wannan ranar aikin. Ga kayayyakin da ba sa cikin sito a yanzu, lokacin tura su na iya bambanta bisa ga samuwa. Ana ba da jigilar kaya zuwa ƙasashen waje, kuma ana ƙididdige kuɗin jigila bisa wurin da ake aikawa, nauyi, da kamfanin sufuri da aka zaɓa.
Ana karɓar mayar da kaya cikin kwanaki 30 bayan karɓa, muddin kayan ba a yi amfani da su ba kuma suna cikin yanayin da suka fito daga masana’anta. Kuɗin jigilar mayar da kaya nauyi ne a kan abokin ciniki. Da fatan za a tuntube mu kafin ku mayar da duk wani kaya domin samun izinin mayarwa.
Don ƙarin bayani, don Allah ku duba Manufar Jigila & Mayar da Kaya.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Isarwa cikin gaggawa
Sassan kayan otomeshan na masana’antu na ainihi suna nan a shirye don aikawa cikin gaggawa a ko’ina cikin duniya.
-
Mayar da kaya cikin sauƙi
Tallafin mayar da kaya na kwanaki 30 tare da garantin watanni 12 don tabbatacciyar kariya bayan saye.
-
Taimako a kowane lokaci (24/7)
Tallafin ƙwararru mai saurin amsawa don taimakawa kiyaye ayyuka cikin kwanciyar hankali da inganci.
-
Na Gaskiya & Asali
Kashi 100% na asali ne, ana samar da su kai tsaye daga amintattun masana’antun kayan sarrafa masana’antu.
Jagorar Fasaha da Siyarwa
-
Can Emerson DeltaV DCS Cards Optimize Chemical Safety Loops?
This technical article examines how Emerson DeltaV DCS card upgrades address legacy control limitations in chemical p...
-
Is Partial CNC Board Replacement Better Than a Full System Upgrade?
This technical article examines the dominance of GE Fanuc CNC hardware in heavy-duty automation, supported by field d...
-
Can Genuine PLC Modules Cut DCS Downtime 60%?
This article examines how genuine Allen-Bradley PLC module replacement strategies directly reduce unplanned DCS downt...
-
Is Your GE Fanuc PLC Talking to ABB DCS?
This article reveals how cross-system data silos between GE Fanuc PLC and ABB DCS cause 8–15% production losses in pr...
-
Can Integrated PLC-DCS-TSI Fix Data Silos?
Most industrial digital twins remain static visualization tools because discrete control, process automation, and con...
-
How to Cut Power Plant Outages with ABB and GE Fanuc Retrofits?
This technical article outlines a data-driven approach to modernizing power plant control systems using a hybrid ABB ...
