Canza gidanka da sabbin hanyoyin na’urorin lantarki masu yawa, daga hasken wuta mai hankali zuwa inganta ayyukanka da Bently Nevada 3500 Monitoring System, wanda ke ba da sa ido a ainihin lokaci kan girgiza da yanayin na’urorin injina don hana gazawa da ƙara lokacin aiki, da na’urorin da ake sarrafa su da murya duk an ƙera su ne don sauƙaƙa rayuwa, ƙara tsaro, da ƙarfafa haɗin kai.
SKU:IC200CHS012
IC200CHS012 GE Fanuc I/O Interface Terminal
Manufacturer: General Electric
Product No.: IC200CHS012
Product Type: Box-Style I/O Terminal
Product Origin: USA
Payment:T/T, Western Union
Weight: 200g
Shipping port: Xiamen
Warranty: 12 months
Raba
- Isarwa Cikin Gaggawa
- Tallafi na awa 24 a rana, kwana 7 a mako
- Tabbacin Inganci
Bayani
GE Fanuc IC200CHS012 VersaMax Interposing I/O Terminal
The GE Fanuc IC200CHS012 is a box-style interposing terminal. It interfaces field wiring with connector-style I/O carriers (e.g., IC200CHS003).
Technical Specifications
- Brand & Model: GE Fanuc IC200CHS012.
- Type: Box-style interposing I/O terminal.
- Terminals: 36 box-style.
- Connector: For cable connection to a connector-style carrier.
- Wire Gauge: AWG 14-22 single; AWG 18 max for dual wire.
- Dimensions: 4.35 x 4.15 inches.
- Operating Temperature: -40 to 60°C.
- Storage Temperature: -40 to 85°C.
- Humidity: 5 to 95% non-condensing.
- Mounting: DIN rail (same or separate from carrier).
- Weight: 200 g.
FAQ
- What is its function? The IC200CHS012 provides a convenient field wiring interface for connector-style carrier systems.
- How many wires per terminal? Supports 1 or 2 wires (AWG 18 max for dual).
- Module weight? 200 grams.
For quotes and support: sale@etowonauto.com.
Ƙarin ƙayyadaddun bayanai
Sikeli (V/f)
Vector
mai amfani da wutar AC
Jagorar Sayi
- Tabbatar da ainihin samfurin, lambar ɓangare, da ƙayyadaddun bayanai kafin yin oda.
- Tabbatar da jituwa da injin ko tsarin kula da kake amfani da su a yanzu.
- Tuntuɓe mu ta sale@etowonauto.com ko +8617859788089 don taimakon fasaha.
- Duba zaɓuɓɓukan isarwa, lokacin jagora, da buƙatun jigilar kaya.
- Bi umarnin masana’anta da mafi kyawun hanyoyin aiki yayin girkawa.
Isarwa da Mayar da Kaya
Kayayyakin da ke cikin sito yawanci ana tura su a cikin wannan ranar aikin. Ga kayayyakin da ba sa cikin sito a yanzu, lokacin tura su na iya bambanta bisa ga samuwa. Ana ba da jigilar kaya zuwa ƙasashen waje, kuma ana ƙididdige kuɗin jigila bisa wurin da ake aikawa, nauyi, da kamfanin sufuri da aka zaɓa.
Ana karɓar mayar da kaya cikin kwanaki 30 bayan karɓa, muddin kayan ba a yi amfani da su ba kuma suna cikin yanayin da suka fito daga masana’anta. Kuɗin jigilar mayar da kaya nauyi ne a kan abokin ciniki. Da fatan za a tuntube mu kafin ku mayar da duk wani kaya domin samun izinin mayarwa.
Don ƙarin bayani, don Allah ku duba Manufar Jigila & Mayar da Kaya.

3500/61-05-CN Temperature Monitor Module | Bently Nevada
3500/22-01-02-CN TDI Module Bently Nevada
Bently Nevada 3500/42-04-00 | Seismic Monitor
-
Isarwa cikin gaggawa
Sassan kayan otomeshan na masana’antu na ainihi suna nan a shirye don aikawa cikin gaggawa a ko’ina cikin duniya.
-
Mayar da kaya cikin sauƙi
Tallafin mayar da kaya na kwanaki 30 tare da garantin watanni 12 don tabbatacciyar kariya bayan saye.
-
Taimako a kowane lokaci (24/7)
Tallafin ƙwararru mai saurin amsawa don taimakawa kiyaye ayyuka cikin kwanciyar hankali da inganci.
-
Na Gaskiya & Asali
Kashi 100% na asali ne, ana samar da su kai tsaye daga amintattun masana’antun kayan sarrafa masana’antu.
Jagorar Fasaha da Siyarwa
-
How to Select GE Fanuc 90-30 Spare Parts for Hot Rolling Mills?
This article provides a technical guide for selecting and managing GE Fanuc Series 90-30 PLC spare parts in meta...
-
How Does Bently Nevada 3500 Reduce Unplanned Turbine Trips?
This technical article analyzes the quantitative value of the Bently Nevada 3500 TSI system in thermal power shaft pr...
-
Dual Compliance Standards for Pharma Automation?
This article presents a quantified engineering methodology for explosion-proof PLC and DCS system design in GMP-certi...
-
How to Avoid Bulk Sourcing Risks for Power Plant Control Spares?
This guide presents field-validated strategies for bulk sourcing industrial control spares in power plants. It q...
-
What Are the Hidden Costs of Fake PLC and DCS Modules?
This guide presents data-driven verification protocols for imported industrial control spare parts, addressing the es...
-
Redundant PLC + DCS: 18.6% Fan Energy Savings?
This case study documents a full automation retrofit for a 300 TPD waste incineration plant. By integrating Emerson D...
